Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply (Amendment) Code, 2008

Tamil Nadu Electricity Supply (Amendment) Code, 2008.

AmendmentDated 15 Dec 2008Published in the Gazette 28 Jan 2009In force from 28 Nov 2008TNERC/SC/ 7- 11 dated 15/12/2008

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is TNERC's two-part amendment to the Tamil Nadu Electricity Supply Code, 2004 (the "principal code"), notified as Notification No. TNERC/SC/7-11 dated 15/12/2008 and carried in the Tamil Nadu Government Gazette of 28 January 2009 (p1–2). Its stated purpose is to meet situations during acute power shortage, when restriction and control measures are declared, and to ensure equitable distribution of power in such contingencies (p2). The amendment itself is short and entirely framework-setting.

Clause 2 inserts a new clause (xiv) into regulation 4(2) of the principal code, creating a charging head called "Excess demand and excess energy charges during Restriction and Control of supply" (p2). Clause 3 inserts a new sub-regulation (13) into regulation 5, which does three things: it prescribes how maximum demand charges for HT supply are computed when a demand quota is in force (whichever is higher of recorded demand at the point of supply or a prescribed proportion of the demand quota) and makes demand recorded above the quota chargeable; it makes energy consumption above the fixed energy quota chargeable for the consumer classes to which restriction and control applies; and it makes services drawing from the TNEB grid for welding sets during restricted hours chargeable (p3).

None of the three limbs fixes a rate: each refers to rates the Commission will specify from time to time (p3). The amendment is deemed to have come into force on 28 November 2008, earlier than both the notification and the gazette publication (p2).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Wheeling and retail supply tariff

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document