Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code, 2004 — 2011 Amendment — Draft

Tamil Nadu Electricity Supply (Amendment) Code, 2011

Draft amendmentDated 5 Apr 2011TNERC/SC/ 7 - dated 05-04-2011

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply (Amendment) Code, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Draft amendment to the Tamil Nadu Electricity Supply Code, 2004, issued by the Tamil Nadu Electricity Regulatory Commission on 5 April 2011 for previous publication, with comments and suggestions invited on or before 21 April 2011 (p1). It is made under section 181 read with section 50 of the Electricity Act 2003 and is to come into force on the date of its publication in the Tamil Nadu Government Gazette (p1).

The operative content is narrow and procedural. Clause 1 gives the short title and commencement (p1). Clause 2 adds a proviso to item (7) of sub-clause (AA) of clause 23 of the Principal Code: where the quantum of energy consumption is recorded in the meter installed by the distribution licensee at the consumer's premises, the authorised officer must arrive at that consumption using the assessment formula in the new Form 8-A (p1–2).

Clause 3 inserts Form 8-A into the Appendix after Form 8 (p2–3). The Form is expressly tied to section 135(1)(e) of the Electricity Act 2003 — use of electricity for a purpose other than that authorised. It sets out three things: a formula for the quantum of misused energy, built from total recorded consumption over the period of violation and the ratio of misused load to total connected load found at inspection; a formula for penal charges that compares the unauthorised-use tariff with the authorised-use tariff; and a list of factors the authorised officer may weigh to fix the period of unauthorised use, directing him to the least period supported by those factors, with an exception where electronic meters and load curves allow the period to be pinned down scientifically (p2–3).

The document is signed by the Secretary of the Commission by order of the Commission (p3). It is a consultation draft, not the notified text: the Gazette date that would start it is not printed, and the notification serial is left incomplete.

Standard name
Electricity Supply Code
Primary topics
Theft and unauthorised use

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document