Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Draft Amendment to the Tamil Nadu Electricity Supply Code, 2019

Draft of amendments to the Tamil Nadu Electricity Supply Code

Draft amendmentDated 9 Jul 2019TNERC/SC/7 –……. dated .07.2019

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code — Amendments, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a TNERC draft notification proposing amendments to the Tamil Nadu Electricity Supply Code, published for public comment with a deadline of 7.8.2019 (p1). It opens with the statutory notice: objections or suggestions go to the Secretary, and the draft will be considered after thirty days from publication on the TNERC website (p1).

The operative amendments occupy pp1–3. They rewrite the excess-demand charge for low-tension services where recorded demand does not exceed 112 KW (p1); revise security-deposit requirements for monthly-billed consumers and add an open-access-specific proviso and an excess-deposit adjustment/refund rule (p2); and replace the procedure for provisional and final assessment of suspected unauthorised use, including use of the highest slab tariff where slab rates apply (p3).

The Appendix changes start at p3. Form 8 is substituted with a formula and factor tables for assessing quantum of energy in theft cases, and with a separate route for illegal restoration after disconnection (pp3–7). Form 12 is added as a provisional assessment order template (pp7–10), and Form 13 as a final assessment order template with payment, disconnection and appeal instructions (pp10–13).

The Explanatory Statement (p14) lists five objectives: uniform LT excess demand charges, additional security deposit from open access consumers, flexibility on adjusting excess security deposit, a time limit and forms for unauthorised-use assessment, and a method for illegal restoration cases. The closing Statement (pp15–28) sets existing and proposed provisions side by side.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Security deposit, Theft and unauthorised use

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document