Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply (Amendment) Code, 2007

AmendmentDated 10 Apr 2007Published in the Gazette 25 Apr 2007Notification No. TNERC/SC/ 7-3 dated 10/04/2007

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short TNERC amendment to the Tamil Nadu Electricity Supply Code, issued as Notification No. TNERC/SC/7-3 dated 10/04/2007 and published in the Tamil Nadu Government Gazette of 25 April 2007 (p1). Its stated reason is that frequent, unrestricted reduction of demand by consumers had made power purchase planning difficult because the Supply Code contained no restrictive provision (p1).

The operative text adds a new sub-regulation (6) to Regulation 17 of the Supply Code (p2). It fixes the initial agreement period at one year from the date supply is availed and clarifies that this period does not apply to a reduction in contract demand. After that year a consumer may reduce demand once in a year without charge; a second or later reduction in the same year attracts a one-time charge of twice the demand charges on the demand surrendered; and a reduction may not exceed 50% of the then existing contracted demand (p2).

The amendment comes into force on the date of its publication in the Gazette, and states that the previous-publication requirement has been complied with (p1–2). It contains no savings, transitional or repeal provisions.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document