Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Harmonic Limits Amendment, 2021 — Draft

Draft of amendments to the Tamil Nadu Electricity Supply Code on stipulating harmonic limits, methodology of measurements, meter standards, penalties etc.

Draft amendmentDated 29 Jun 2021TNERC/SC/7 –……. dated .06.2021

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code, 2004 — Harmonic Control Amendment, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The document is a TNERC draft notification proposing amendments to the Tamil Nadu Electricity Supply Code on current harmonics. It is published for comments by 29.07.2021 (p1). The recitals explain that harmonics were hitherto measured only for bulk consumers at 33 kV and above under a 2017 TNERC order based on the CEA's 2007 connectivity standards; CEA amendments in 2019 extended harmonic-compliance obligations to all 33 kV-and-above consumers and to consumers below 33 kV, and renamed the distributed-generation connectivity regulation (pp1–2). TANGEDCO's petition was admitted on 25.08.2020, sample measurements were directed, and senior consultants were appointed to recommend methodology and Supply Code changes (pp2–3).

The draft amendment substitutes regulation 4(1)(iv) with a “Current Harmonic control” clause (pp4–9). It requires harmonic currents from non-linear loads to be kept within limits, measured at the point of common coupling, using an IEC 61000-4-30 edition 3.0 class A power quality meter; the licensee is to measure each installation for one week and compare three TDD percentile values against IEEE Std. 519-2014, using the highest for penalty (pp4–5). If limits are exceeded, the consumer is given a filter-installation notice; non-compliance leads to a stepped penalty on monthly current consumption charges and, after the penalty period, a 30-day disconnection notice, with testing and re-testing rights (pp5–8). New supply applicants must self-declare future filter installation, with measurement after 12 months (pp8–9).

The clause applies to bulk consumers at 33 kV and above and to consumers, prosumers and charging stations below 33 kV, subject to stated exclusions (pp1, pp8–9). An explanatory statement grounds the change in the Electricity Act and the 2016 Tariff Policy (pp94–95), and a comparative annexure sets out the existing and amended text (pp96–105). The notification encloses an 83-page consultants' report (p9).

Standard name
Electricity Supply Code
Primary topics
Power quality, Technical standards, Metering

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document