TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code, 2004 — Sixth Amendment, 2011 — Draft

Tamil Nadu Electricity Supply (Sixth Amendment) Code, 2011

Draft amendmentDated 1 Dec 2011TNERC/SC/ 7 – ….. dated 01-12-2011

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft amending Code issued by the Tamil Nadu Electricity Regulatory Commission on 01-12-2011, proposing the Tamil Nadu Electricity Supply (Sixth Amendment) Code, 2011 to the State's Electricity Supply Code, which was notified in the Tamil Nadu Government Gazette on 1 September 2004 (p1). It is put out under the condition of previous publication, comments and suggestions are invited up to 21-12-2011, and the amendments would take effect only on publication in the Tamil Nadu Government Gazette — a date the document does not print (p1).

Clause 1 gives the short title and the commencement rule (p1). Clause 2 substitutes Regulation 3 of the principal Code, replacing the categories of supply with a graded schedule that ties the consumer's connected load or demand to a supply voltage: single-phase 240 V, three-phase 415 V, 11 kV or 22 kV, 33 kV, 110 kV and 230 kV, with the band boundaries expressed in watts, kW, kVA and MVA. It preserves a consumer's right to elect among the lower categories where the connected load does not exceed 4,000 watts, requires LTCT metering above a stated load, and provides that a consumer who opts for a higher voltage than its demand band must bear the licensee's extra cost of supplying at that voltage (p1–2).

Clause 3 amends Regulation 5 on two fronts: it substitutes the penal-charge item applied where recorded demand exceeds 112 kW with an escalating, occurrence-based rate structure, and it inserts a clause leaving the cost of metering-system modifications on account of load addition or reduction to be dealt with under the Act and the Codes/Regulations. It also adds a sub-clause defining what the security deposit in the relevant categories includes and, notably, what it must exclude (p3).

Clause 4 inserts a new sub-regulation in Regulation 7 requiring an ABT-compliant meter at both the generator and consumer ends for an open access consumer (p3–4). Clause 5 substitutes Regulation 13(1) on billing: HT bills may be sent by post, hand delivery or email, two email IDs must be furnished, the date of sending the email fixes the due date, the licensee disclaims responsibility for loss in transit, and non-receipt of a bill does not excuse late payment; for LT services the meter-card entry itself is the bill (p4).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Billing and payment, Metering

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Proposed changes (drafts with no final yet)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document