TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Amendment to Regulations 4, 5, 7, 15 and 27, 2014

Amendments to the Tamil Nadu Electricity Supply Code.

AmendmentDated 1 Jul 2014Published in the Gazette 6 Aug 2014TNERC/SC/7-36 dated 01-07-2014

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Tamil Nadu Electricity Regulatory Commission amends its Electricity Supply Code by a notification dated 1 July 2014, published in the State Gazette of 6 August 2014 (p1–2). The changes originate from suggestions of the Code Review Panel and touch five regulations.

Regulation 4(2) re-casts the list of miscellaneous, non-tariff charges a distribution licensee may recover, adding restoration-of-cheque-facility charges and testing charges for equipment, and splitting the service/line/structure shifting head into sub-heads (p2, p5).

Regulation 5(6) rewrites how the cost of shifting a service, line, structure or equipment is estimated and settled — reuse of dismantled material, percentage add-ons for dismantling, transport and erection, credits due to the consumer, and a revised estimate with refund or recovery of the difference (p2–3, p6). Regulation 5(12) replaces the registration-charge list with a longer enumeration of applications that attract it, rates being left to Commission orders (p3, p6–7).

Regulation 7 requires all new connections to be metered, with demand-recording meters for new LT connections (p3, p7); HT services are to be metered on the HT side, with a formula for adding transformer loss and for converting LT-recorded maximum demand into HT demand where metering remains on the LT side, and instrument transformers are to be accuracy-tested periodically under the CEA Meter Regulations, 2006 (p3–4, p7–8).

Regulation 15(4) separates service charges for a dishonoured cheque from charges for restoring cheque-payment facility, and caps how many times that facility may be restored (p4, p8).

Regulation 27 reconstitutes the Code Review Panel — chairperson drawn from the distribution licensee, wider licensee representation, and seats for LT consumer sectors, EHT/HT and open access consumers — with three-year terms and no re-nomination (p4, p9). An explanatory statement and a comparative statement follow (p4–9).

Standard name
Electricity Supply Code
Primary topics
Connection and miscellaneous charges, Metering, Billing and payment

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document