Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Amendments, 2019

Amendments to the Tamil Nadu Electricity Supply Code

AmendmentDated 18 Dec 2019Published in the Gazette 29 Jan 2020TNERC/SC/7-40 dated 18-12-2019

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 30 of 50. Check the regulator's original before you rely on it.

This is a Tamil Nadu Government Gazette issue (Part VI—Section 2, No. 5, 29 January 2020) that carries amendments by the Tamil Nadu Electricity Regulatory Commission to the Tamil Nadu Electricity Supply Code, made under s.181 read with s.50 of the Electricity Act, 2003 (p1–2). The pages cover only the Supply Code amendment item (pp2–50); the contents page also lists separate amendments to the Tamil Nadu Electricity Distribution Code (pp51–61) and unrelated certificate-loss notices (p62) (p1).

The operative notification, dated 18 December 2019, substitutes specified clauses in the Supply Code: the excess-demand charge for recorded demand not exceeding 112 KW, the additional security deposit basis for monthly-billed consumers including open access consumers who partially draw through open access, the treatment of excess security deposit, and the procedure for provisional and final assessment of unauthorised use of electricity (p2). It replaces Appendix Form 8 with a formula and tables for assessing the quantum of energy in theft cases, including illegal restoration of a disconnected supply (p3–4). It adds Form 12 and Form 13 as templates for provisional and final assessment orders under s.126, including payment timelines, objection rights, disconnection consequences and appeal details (p5–7).

The Explanatory Statement lists five purposes of the changes (p7). Pages 8–21 then reproduce the amendments as a side-by-side ‘existing provision’ and ‘provision embodying amendment’ table, with ‘xxx’ placeholders for unchanged text.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Theft and unauthorised use, Security deposit

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document