TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply (Amendment) Code, 2010 — Draft

Tamil Nadu Electricity Supply (Amendment) Code, 2010

Draft amendmentDated 13 Jul 2010TNERC/SC/ 7- dated -07-2010

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code, 2005 — Amendment Code 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft TNERC notification proposing a single-clause amendment to the Tamil Nadu Electricity Supply Code. The preamble (p1) recalls that the Supply Code was notified under section 50 of the Electricity Act 2003 and published in Part VI, Section 2 of the Tamil Nadu Government Gazette dated 1 September 2004, and records that difficulties had been brought to the Commission's notice over collecting the Additional Security Deposit within thirty days from consumers. The Commission therefore proposes amendments, to be made under section 50 read with section 181 of the Act and subject to the condition of previous publication.

The operative part (p2) is styled the Tamil Nadu Electricity Supply (Amendment) Code, 2010. Clause 1 gives the short title and fixes commencement with effect from 30-06-2010 — earlier than the draft's own July 2010 date. Clause 2 substitutes clause (iv) of sub-regulation (5) of Regulation 5 of the Supply Code. The substituted clause deals entirely with the Additional Security Deposit: how the shortfall between the available deposit and the revised Security Deposit is to be collected; how the demand is to be intimated, distinguishing high-tension services (separate notice) from low-tension services (distinct entry in the consumer meter card or separate notice); the thirty-day notice period for payment; the liability to disconnection if payment is not received within that period; and the licensee's permission to collect the Additional Security Deposit in three instalments. The draft closes with the Secretary's order line (p2).

Standard name
Electricity Supply Code
Primary topics
Security deposit

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document