Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply (Amendment) Code 2006

AmendmentDated 19 May 2006In force from 1 Sep 2004Notification No. TNERC/SC/7-2 dated 19/05/2006

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a three-page TNERC notification amending the Tamil Nadu Electricity Supply Code on when a disconnected consumer may be reconnected (p1). The Commission records that the existing Code allowed consumers of disconnected LT services to get reconnection if they came forward to remit charges within two years of disconnection, and that LT agricultural consumers and the distribution licensee found this unworkable given the long wait for agricultural service connections. It therefore substitutes sub-regulations (6) and (7) of Regulation 22 of the Code, exercising its powers under section 50 of the Electricity Act 2003 after the required previous publication (p1).

The substituted sub-regulation (6)(i) specifies the window — after a service connection has been disconnected for non-payment beyond the three-month notice period — within which a consumer may pay the actual dues and have the termination of agreement revoked, differentiated by consumer category (HT, LT agricultural, other LT), and makes reconnection conditional on the lines feeding the service connection not having been dismantled (p2). Sub-regulation (6)(ii) lets the licensee's authorised officer permit payment of a share of the total outstanding (arrears at disconnection, tariff minimum and meter rent for six months, and BPSC/interest) with reconnection on receipt of that share, the balance in ten monthly instalments, and the adjusted security deposit in one lumpsum (p2–3). Sub-regulation (7) provides that a consumer who comes after that window is treated as a new applicant, with supply effected only after all new-connection charges and all arrears with BPSC are recovered (p3).

Clause (1) gives the short title and deems the amendment to have come into force from 1 September 2004, the date the principal Code commenced (p1–2).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Billing and payment, Agricultural supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document