Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Draft Amendment, 2019

Draft of amendments to the Tamil Nadu Electricity Supply Code

Draft amendmentDated 7 Nov 2019TNERC/SC/7 dated -11-2019

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code — Amendments, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TNERC's draft amendment to the Tamil Nadu Electricity Supply Code, published so that affected persons can object or suggest (p1). It would rewrite two provisions: the categories-of-supply regulation (reg 3(1)) and the excess-demand-charge regulation (reg 5(2)). Objections are to be sent in duplicate to the Secretary within thirty days of publication on the TNERC website (p1).

The centrepiece is the LT ceiling. Three-phase 4-wire LT supply would run from above 4000 W connected load up to a sanctioned demand of 150 KW, replacing the present 112 KW limit, and the opening words of reg 3(1) are reworded so that the consumer *avails* supply under a category rather than being assigned one (p1–2). For sanctioned demand above 112 KW up to 150 KW the draft attaches a proviso: the consumer provides space for the licensee's distribution transformer (on the premises or private land within 100 m, extendable by the Superintending Engineer to 200 m in exceptional cases) and builds the mounting arrangement; the licensee installs the transformer and its switchgear at its own cost; the consumer bears the cost of works from the LT side of the transformer to the meter (p2–3). The proviso overrides Distribution Code reg 29(17)–(18) so that the service line is maintained by the consumer, and sets fixed charges for the 112–150 KW band as a blend of LT fixed charges on the first 112 KW plus HT demand charges per kVA on the balance, per the Commission's tariff order (p3).

An Explanation lets existing LT consumers above 112 KW opt into that arrangement or, failing that, pay excess demand charges under reg 5(2)(ii)(c)(II) (p3). Regulation 5(2) is then reworked: a recast excess-demand clause for consumers sanctioned up to 112 KW, a new clause for the 112–150 KW band, revised load-sanction revision rules on a second exceedance, and — where recorded demand exceeds 150 KW a second or later time — a month's notice to convert LT service to HT with all charges indicated (p4–5).

The Explanatory Statement gives the aims: improving the HT/LT line ratio, facilitating supply under the Department of Industrial Policy and Promotion's 'Ease of doing business' programme, and offering consumers choice of supply (p6). Pages 7–11 place the existing and proposed texts side by side (p7–11).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Connection and miscellaneous charges

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document