Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code and State Advisory Committee Regulations — Amendments, 2013

Amendment to the Tamil Nadu Electricity Supply Code

AmendmentDated 23 Sep 2013Published in the Gazette 23 Oct 2013TNERC/SC/7-33 dated 23-9-2013

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is one issue of the Tamil Nadu Government Gazette — Part VI, Section 2 (notifications of interest to a section of the public), No. 41, dated 23 October 2013 — carrying a batch of amendment notifications issued by the Tamil Nadu Electricity Regulatory Commission (p1). Its contents page lists four amendments: to the Tamil Nadu Electricity Distribution Standards of Performance Regulations (printed pages 536–543), twice to the Supply Code (543–546 and 546–548), and to regulation 12 of the State Advisory Committee Regulations 2004 (548) (p1).

The first printed amendment (Notification No. TNERC/SC/7-33 dated 23-9-2013) makes a single change to the Tamil Nadu Electricity Supply Code: it omits the clause in regulation 4(1)(i) that required commercial tariff to be charged for supply for construction of residential houses and housing complexes until completion, and a change to the appropriate tariff on completion (p2). The explanatory statement says a separate tariff for temporary supply for construction and other temporary purposes was already fixed in the Commission's Retail Tariff Order dated 20-06-2013, so the Supply Code need not repeat it (p2). A two-column statement shows the existing text against the amended text and preserves the clarification that temporary use of floor-polishing, welding and similar portable equipment in a premises that already has permanent supply counts as regular consumption under the permanent supply tariff, not temporary supply (p2–3).

The second printed amendment (Notification No. TNERC/SACR/2-37 dated 4-10-2013) inserts a new sub-regulation (5) in regulation 12 of the TNERC State Advisory Committee Regulations, 2004, requiring the Commission to reimburse accommodation charges, capped at Rs 2000/- (Rupees two thousand only) per day of the meeting, to committee members who reside outside Chennai and attend a meeting convened in Chennai, on production of a hotel or lodge bill (p4).

Neither amendment states a commencement date; both are printed in the Gazette of 23 October 2013.

Standard name
Electricity Supply Code, State Advisory Committee
Primary topics
Conditions of supply, Advisory committees

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document