Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code, 2005 — Draft Amendment — Minimum Charges for Disconnected HT Services

Draft Amendment to Tamil Nadu Electricity Supply Code, 2005

Draft amendmentDated 28 Jun 2013TNERC/SC/ 7- dated -07-2013

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Supply Code — Minimum Charges Amendment, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

TNERC publishes, for the information of all persons likely to be affected, a draft amendment to the Tamil Nadu Electricity Supply Code, 2005 that would replace regulation 6(b) — the provision governing monthly minimum charges for high-tension services disconnected at the consumer's request (p1–2).

Page 1 is the statutory notice. The draft is issued under s.181(2)(x) read with s.181(3) of the Electricity Act, 2003 and will be taken into consideration on or after the expiry of fifteen days from its publication on the TNERC website; objections or suggestions received within that window will be considered. Comments must be sent in duplicate to the Secretary, TNERC, Chennai (p1).

Page 2 carries the operative text. The proposed sub-regulation (b) of regulation 6 sets the basis for monthly minimum charges on KVA demand for HT services disconnected on consumer request: the actual recorded demand where the disconnection covers part of a month, or such percentage of sanctioned demand as the Commission may declare, whichever is higher. A proviso carves out disruption events — cyclone, floods, storms, fire, strike or lockout in the licensee's establishment, or similar occurrences preventing the consumer from consuming electricity — allowing the licensee to recover a minimum charge at twenty percent of sanctioned demand or recorded demand, whichever is higher, plus charges for actual consumption (p2).

The instrument is a proposal: no final notification, effective date or fate is stated, and the notification number leaves the day of the month blank (p1).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document