Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Consolidated, as amended up to 31.7.2008

Tamil Nadu Electricity Supply Code (TNESC).

Consolidated copyDated 31 Jul 2008Published in the Gazette 20 Aug 2008TNERC / SC / 7 - 9 dated 31.7.2008

A consolidated copy of the Tamil Nadu Electricity Supply Code (TNESC), published by TNERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 21 of 63. Check the regulator's original before you rely on it.

This is TNERC's consolidated re-publication of the Tamil Nadu Electricity Supply Code as amended upto 31.7.2008, issued as Notification No. TNERC/SC/7-9 dated 31.7.2008 and gazetted on 20 August 2008 (p1–2). The Commission explains that ten amending notifications published between 2005 and June 2008 had left the Code scattered, and that it is re-publishing one up-to-date text so the public can read it as a whole (p2). For an analyst the important consequence is that this single document is both the original 2004 Code (Notification TNERC/SC/7/1 of 21.07.2004) and the record of every change made to it: each amended clause is followed by a footnote giving the amending notification, its w.e.f. date and, where relevant, the text it replaced (pp4–21).

Chapter 1 (pp3–5) carries the short title and commencement clause and the definitions — consumer, connected load, contracted load and contracted demand, the LT/HT/EHT consumer categories, licensee engineer, distribution licensee, State Transmission Utility, power factor, load factor and others. Chapter 2 (pp5 onwards) is the operative core. Regulation 3 sets out the categories of supply by phase, voltage and connected load. Regulation 4 lists everything a distribution licensee may recover — tariff-related charges (energy price, demand/fixed charges, power factor disincentive and incentive, harmonics compensation, electricity tax) and miscellaneous charges (capacitor compensation, excess demand, excess contracted load, belated payment surcharge, additional security deposit, shifting, name transfer, reconnection, meter card, dishonoured cheque, meter-related and application registration charges).

Regulation 5 then works through each miscellaneous charge in turn: who must install capacitors and what happens when they are missing or defective; the excess-demand regime with its exemptions and thresholds; the special agricultural-service regime for excess contracted load, including motor nameplate checks and laboratory testing; belated payment surcharge with separate treatment for local bodies and government departments; review and refund of security deposits; shifting and name-transfer procedure; and the many heads where the Commission says the rate will be notified from time to time (pp6–14). Regulation 6 prescribes minimum charges, including on disconnection and relief during strike, lockout or natural events (pp14–15). Regulations 7–11 govern metering and billing: installation, sealing, section 55 of the Act, transformer-loss computation where an HT service is metered on the LT side, recalibration, consumer-requested special tests at a NABL-accredited laboratory, replacement of defective and burnt meters, meter reading and billing intervals, inaccessible meters, and assessment of consumption where there is no meter or the meter is defective (pp15–19). Regulation 12 handles billing errors and interest-bearing refunds; Regulations 13–17 cover servicing of bills, due dates and notice periods, disconnection, mode of payment and the consequences of a dishonoured cheque, advance payment, and the consumer's continuing obligations under the agreement (pp19–21).

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, Metering, Billing and payment

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (3)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document