Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code — Power Factor Disincentive Amendment, 2017 — Draft

Draft Notification No. TNERC/SC/7 –……. dated -2017.

Draft amendmentDated 24 May 2017TNERC/SC/7 –……. dated -2017

Draft

A proposal that has since been finalised as the Tamil Nadu Electricity Distribution Code Amendments, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a four-page TNERC draft notification proposing a change to the Tamil Nadu Electricity Supply Code, not a final regulation. Page 1 publishes the draft under s.181 read with s.50 of the Electricity Act 2003, invites objections or suggestions, sets a comment deadline of 08-6-2017, and says the draft will be considered after fifteen days from publication on the TNERC website; it gives the Secretary's Chennai address for comments.

The operative amendment on pp1–2 substitutes regulation 4(1)(iii). The new clause requires every consumer to maintain a power factor of 0.90 for LT supply and 0.95 for HT supply. A consumer who fails is liable to pay compensation by way of a disincentive at rates the Commission may declare from time to time; the draft itself does not fix those rates.

Page 3 is the explanatory statement. It records that the existing clause already provides for a power-factor disincentive, with rates set in tariff orders, and explains that improving power factor uses system capacity better, improves voltage and reduces losses; consumers with correction equipment may also gain through lower consumption and better equipment performance. It describes the proposal as increasing the power factor to be maintained by LT and HT consumers.

Page 4 is a statement comparing the existing provision with the amended provision. The document is therefore a consultation draft: it tells consumers what standard is proposed and where to object, but leaves the monetary disincentive to later Commission declarations.

Standard name
Electricity Supply Code
Primary topics
Power quality, Conditions of supply

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document