Skip to content

TNERC · Tamil Nadu Electricity Regulatory Commission

Tamil Nadu Electricity Supply Code, 2004 — Harmonic Control Amendment, 2022

Amendments to the Tamil Nadu Electricity Supply Code

AmendmentDated 29 Mar 2022Published in the Gazette 21 Sep 2022TNERC/SC/7 – 47 dated 29.03.2022

Amends the Tamil Nadu Electricity Supply Code (TNESC).

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a Tamil Nadu Electricity Regulatory Commission notification (No. VI(2)/98/2022; TNERC/SC/7 – 47 dated 29 March 2022) published in the Tamil Nadu Government Gazette on 21 September 2022, amending the Tamil Nadu Electricity Supply Code notified on 1 September 2004 (p1–2). It substitutes regulation 4(1)(iv) on charges for harmonics dumping with a new 'Current Harmonic control' regime, and is accompanied by a Statement of Reasons (p4) and a comparative annexure reproducing the old clause against the amended text (pp5–7).

The new regulation requires harmonic currents generated by consumers, prosumers and charging stations connected at 11 kV, 22 kV and 33 kV and above to be kept within the limits of IEEE Std 519-2014, measured at the point of common coupling with a class-A power quality meter complying with IEC 61000-4-30 edition 3.0 (p2). The licensee measures three total demand distortion (TDD) percentile values and levies penalty on the highest; a non-compliant user gets six months to install filters, failing which penalty runs for the following twelve months, followed by a 30-day disconnection notice and eventual disconnection, with the penalty ceasing from the date the user intimates that filters are installed and ready for testing (p2–3). Penalty is a percentage of monthly current consumption charges, banded by the extent of TDD excess and capped at 10%, with a rounding convention for decimals (p3). New connections may be released against a self-declaration that filters will be installed, with measurement after twelve months (p3).

The Statement of Reasons grounds the amendment in section 86(1)(i) of the Electricity Act 2003, clause 8.0 of the Ministry of Power's Tariff Policy of 28 January 2016, and the CEA's 2019 amendments to its grid-connectivity and distributed-generation regulations, and records that the question of penalising consumers below 33 kV had been litigated before the Madras High Court (p4).

Standard name
Electricity Supply Code
Primary topics
Power quality

Read with this

The regulation

Amendments and corrections

Consolidated copies, for reference (4)

Earlier drafts

32 more documents belong here and are not on Voltaic: 30 copies in another language, 1 corrigendum not held as English text and 1 draft or notice on a draft.

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗

Report an issue with this document