Inter-State Transmission Connectivity, Long-term Access and Medium-term Open Access (Fourth Amendment) Regulations, 2014 — Draft

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fourth Amendment) Regulations, 2014

Draft amendmentDated 18 Feb 2014No. L-1/(93)/2009-CERC dated 18th February, 2014

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC draft notification dated 18 February 2014 (p1) proposing the fourth amendment to the Commission's 2009 regulations on grant of connectivity, long-term access and medium-term open access in inter-State transmission. The operative text is framed as final amending regulations, but the document is headed 'DRAFT NOTIFICATION' (p1).

Clause 1 gives the short title and commencement: the instrument is the (Fourth Amendment) Regulations, 2014 and takes effect from the date of publication in the Official Gazette; the Gazette date is not printed (p1).

The substance is a single substitution — Regulation 8(7) of the Principal Regulations is replaced in full (p1). The new clause allows a unit of a generating station, including a captive generating plant, that has been granted inter-State transmission connectivity to interchange infirm power with the grid during the commissioning period, including testing and full-load testing before COD, after obtaining prior permission of the concerned Regional Load Despatch Centre (p1). It lays down separate outer windows for drawal of start-up power and for injection of infirm power, each keyed to first synchronization and COD (p1–2), and bars use of start-up power for construction activity.

Four further provisos allow the Commission to extend the interchange period in exceptional circumstances on an advance application; direct the RLDC, when granting permission, to keep grid security in view; place the onus of proving that interchange serves commissioning on the generating company, which must furnish the RLDC details of the specific activity, its duration and intended interchange on each occasion; and deem the infirm power so interchanged to be deviation, paid or charged under the CERC Deviation Settlement Mechanism Regulations, 2014 as amended (p2).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Deviation settlement (DSM)

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document