Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 — Seventh Amendment, 2018 — Draft

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Seventh Amendment) Regulations, 2018

Draft amendmentDated 9 Aug 2018No.–L-1/(3)/2009-CERC dated 9 th August, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A draft CERC notification dated 9 August 2018 proposing the Seventh Amendment to the Commission's 2009 regulations on connectivity, long-term access (LTA) and medium-term open access (MTOA) in inter-State transmission (p1). It is issued after previous publication and would take effect from the date of gazette notification, which is not printed (p1).

The bulk of the amendment rewrites the applicant-eligibility categories in Regulation 2 (p1–4). It restates who may seek connectivity: conventional generating stations and captive plants at the upper end of the capacity range, a lower threshold for renewable energy stations, a hydro band, and lead-generator arrangements that let several sub-threshold hydro, storage or renewable units pool into a single CTU connection point (p1–2). It adds renewable power park developers, government-designated implementing agencies acting as intermediary procurers, and standalone storage project developers as eligible applicants, and extends LTA/MTOA eligibility to consumers, traders and distribution licensees (p2–3). New definitions cover renewable and renewable-hybrid generation and parks, renewable power developers, implementing agency and storage technologies (p3–4).

Regulation 8 is reworked in detail (p4–7): material-change thresholds that force a fresh application; permission to add capacity at existing connectivity within the same injection limit; a two-stage Stage-I/Stage-II connectivity process for renewable, storage and park applicants, with the Detailed Procedure of 15 May 2018 deemed issued under the regulations; Stage-I granted at a primary and an alternate location; and a new Regulation 8A barring transfer, assignment or pledging of connectivity or LTA, with carve-outs for implementing agencies and 100% subsidiaries.

Later clauses make consequential changes: transmission licensees need not apply for connectivity (Regulation 5, p4); wording changes in Regulations 9 and 12, including that Stage-II is not a prerequisite for LTA for certain renewable and implementing-agency applicants (p7); deletions in Regulation 13 (p7); substituted agreement provisions for long-term access (Regulation 15, p7–8) and medium-term open access (Regulation 21, p8); a tie to tariff-regulation timelines for construction of transmission elements (Regulation 27, p9); and deletion of Regulation 29 (p9). A closing Note lists the gazette publication of the Principal Regulations and each earlier amendment (p9).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Energy storage deployment

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document