Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission (Fourth Amendment) Regulations, 2014

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fourth Amendment) Regulations, 2014

Amendment · Gazette copyDated 12 Aug 2014Published in the Gazette 21 Aug 2014No. L-1/(93)/2009-CERC. dated 12th August, 2014

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 — Fourth Amendment, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short CERC notification making the Fourth Amendment to the Commission's 2009 regulations on connectivity, long-term access and medium-term open access in inter-State transmission. It was issued on 12 August 2014 under section 178 of the Electricity Act 2003 and carried in the Gazette of India, Extraordinary, Part III Section 4, No. 245, dated 21 August 2014 (p1–2). It comes into force on the date of publication in the Official Gazette (p3).

The operative part substitutes clause (7) of Regulation 8 of the Principal Regulations (p3–4). The new clause governs what a generating unit — including a captive generating plant — that holds connectivity to the inter-State Transmission System may do with start-up power and infirm power during the commissioning period. It allows interchange of infirm power with the grid for testing and full-load testing before COD, but only with the prior permission of the concerned Regional Load Despatch Centre, and it sets outer time limits on drawal of start-up power relative to first synchronisation and on injection of infirm power from that date (p3).

Conditions attach to the permission. Drawal of start-up power is subject to payment of transmission charges and to opening a revolving and irrevocable letter of credit from a scheduled bank covering two months' transmission charges; start-up power may not be used for construction; and the RLDC must stop the drawal where construction use is established or where the generator defaults on monthly transmission charges, on the transmission licensee's request (p3). The Commission may extend the periods in exceptional circumstances on an application made at least two months in advance, and the RLDC must keep grid security in view (p3).

The onus of proving that an interchange is for commissioning lies on the generating company, which must give the RLDC details of each occasion (p3). Infirm power so interchanged is treated as deviation and paid or charged under the CERC Deviation Settlement Mechanism Regulations, 2014 (p4). A closing note records the Principal Regulations and their three earlier amendments (p4).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Payment security, Deviation settlement (DSM)

Read with this

Other copies of these documents (6)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document