Skip to content

CERC · Central Electricity Regulatory Commission

Start-up Power for New Generating Stations Procedure, 2014

Procedure for drawl of Start-up Power for new Generating Stations, 2014

Published with a draftReleased with the draft dated 18 Feb 2014

Published with the Inter-State Transmission Connectivity, Long-term Access and Medium-term Open Access (Fourth Amendment) Regulations, 2014 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC procedure, styled "Procedure for drawl of Start-up Power for new Generating Stations, 2014", setting out how a generating station still in its commissioning phase may draw start-up power from the inter-state grid through the Deviation Settlement Mechanism rather than as a distribution licensee's HT consumer or through short-term open access (p1). Sections 1 and 2 fix the scope and define construction power, start-up power and auxiliary power (p1). Section 3 lists the three permissible procurement routes (p1). Section 4 lays down pre-conditions: CTU connectivity under the Connectivity Regulations 2009, a signed connection agreement, established ISTS connectivity, commissioned switchyard equipment, data and voice communication with the RLDC, protection as specified by the RPC, and GT/ST tap coordination (p1–2).

Section 5 sets the application process: a request to the concerned RLDC at least one month ahead and up to 11 months before expected first synchronisation, with a prescribed list of enclosures, an undertaking on permitted use and liability, and continuing fortnightly and monthly reporting while power is drawn (p2–3). Section 6 sets out the RLDC's role: conveying the permitted period, quantum and duration; allowing switchover to the mechanism where ATC margin permits; issuing real-time curtailment directions for system security; enforcing the outer entitlement of 16 months with a route back to the Commission for extension; directing under-frequency/under-voltage relays; permitting drawal by only one unit at a time; and staggering drawal between stations (p4). Pages 5–7 give the three standard formats (p5–7).

Standard name
DSM Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document