Revised Procedure for Grant of Connectivity to Renewable Projects to the Inter-State Transmission System — Order, 2021

Approval of Revised Procedure for "Grant of Connectivity to projects based on renewable sources to inter-State transmission system" under Regulation 27 of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009

OrderDated 20 Feb 2021No. L-1/ (3)/2009-CERC dated 20th February 2021

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's order dated 20 February 2021 approves a Revised Procedure for granting connectivity to renewable-energy projects to the inter-State transmission system, made under Regulation 27 of the CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 (p1). It records that the Pre-revised Procedure came into force on 15.5.2018, that the 7th amendment to the 2009 Regulations was notified on 28.01.2019, and that a draft amendment to the procedure was notified on 24.07.2020 for comments by 16.8.2020 (p1–2). Twenty-seven stakeholders commented, and the Commission considered their comments (p2). The Commission approves the Revised Procedure, enclosed as an Annexure, and directs the Central Transmission Utility to give it wide publicity (p2). The Revised Procedure comes into force from the date of the Order, and the Pre-revised Procedure ceases to have effect from that date, save as otherwise provided in the Revised Procedure (p2).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document