CERC · Central Electricity Regulatory Commission

Corrigendum 2 to Notification dated 9 January 2019

Corrigendum 2

CorrigendumDated 5 Aug 2019Published in the Gazette 28 Jan 2019No. L-1/(3)/2009-CERC dated 5 th of August, 2019

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Corrects the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page CERC corrigendum (p1) making a single textual correction to an earlier Commission notification. It records that in notification No. L-1/(3)/2009-CERC dated 9 January 2019 — published in the Gazette of India, Extraordinary, Part-III, Section 4, S. No. 24, dated 28.1.2019 — one insertion is to be made: at page 13, line 22, the words "Except for 2nd proviso," are to be inserted before "The sub-clause (8)" (p1). The correction therefore narrows the scope of sub-clause (8) in the parent notification by carving out the second proviso; nothing else in that notification is touched. The corrigendum is signed by the Secretary and dated 5 August 2019, roughly seven months after the parent notification and its gazette publication. The document does not restate the parent instrument's title, state a commencement or gazette-publication date for itself, or make any other amendment.

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗