Connectivity, LTA and MTOA (Third Amendment) Regulations, 2013 — Explanatory Memorandum — Draft

Explanatory Memorandum for the "Draft Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium –term Open Access in inter-State Transmission and related matters) (Third Amendment) Regulations, 2013"

Explanatory memorandum to a draftReleased with the notice dated 22 Feb 2013

Draft

The draft has since been finalised as the Connectivity, LTA and MTOA (Third Amendment) Regulations, 2013.

Explanatory memorandum to the Connectivity, LTA and MTOA (Third Amendment) Regulations, 2013 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum for a proposed third amendment to the 2009 Connectivity Regulations, the instrument that governs who may connect to the inter-State transmission system and on what terms (p1). It opens by reciting the parent regulation, in force from 1.1.2010, and the September 2010 amendment that lowered the connectivity threshold for renewable generating stations from 250 MW to 50 MW, and by restating the resulting definition of "Applicant" in Regulation 2(b)(i) (p1).

The substance sits in paras 1.3–1.5 (pp1–2). Existing generating stations connected to the inter-State grid often hold surplus land on which a small renewable plant could be co-located, reusing the same interconnection and transmission assets. Because the prevailing thresholds do not reach such small plants, they must instead connect to the state system, which means long evacuation lines, right-of-way problems, and higher cost and losses. CERC therefore proposes inserting a new sub-clause (e) into Regulation 2(b)(i), allowing a renewable energy generating station of 1 MW and above, developed by a generating company inside its own station of a kind already covered by the clause, to take connectivity at the existing CTU connection point, subject to a transmission capacity margin being available (p2).

The memorandum is consultative: comments, suggestions and objections are invited from stakeholders and other interested persons, with no deadline stated (p2).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document