Connectivity Regulations, 2018 — Seventh Amendment — Statement of Reasons

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Seventh Amendment) Regulations, 2018

Statement of reasonsDated 9 Jan 2019No.–L-1/(3)/2009-CERC

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 32 of 62. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons (SoR) for the draft and finalized Seventh Amendment to the Connectivity Regulations, 2018. It records that the draft was notified on 9.8.2018, that comments came from 17 stakeholders and that a public hearing was held on 19.9.2018, then explains each change the Commission adopted (p1). It is the reasoning document, not the amendment notification itself: it sets out proposed text, stakeholder comments and the Commission's decision on each clause (p1–2).

The first group of changes (Sections 2–12, pp2–25) rewrites the definition of "Applicant" in Regulation 2(1)(b)(i). It separates eligibility for connectivity into non-renewable generating stations and captive plants of 250 MW and above (p4–6), renewable energy stations of 50 MW and above (p6–9), hydro stations between 50 MW and 250 MW (p9), groups of sub-50 MW hydro/storage or renewable stations applying as a lead generator (p9–13), renewable stations of 5 MW capacity and above inside or near an existing generating station (p13–15) or inside an existing renewable park (p14–15), renewable power park developers (p15), renewable energy implementing agencies (p15–20), and standalone storage projects of 50 MW or above (p15–20). The Commission also adds definitions for Renewable Energy Implementing Agency, Renewable Energy Generating Station, Renewable Hybrid Generating Station, Renewable Hybrid Power Park, Renewable Power Park Developers and Storage (pp20–25). It declines requests to raise the RE threshold to 250 MW, to define captive generating plant in these regulations, and to add a standalone storage park developer (pp5–6, pp8–9, p15).

Sections 13–17 (pp25–32) deal with operational provisions. Regulation 5 is amended so transmission licensees need not apply for connectivity (p25). Regulation 8(1) gets a revised material-change trigger for fresh applications, covering more applicant categories (pp25–27), and a new proviso allows an applicant to use existing connectivity for additional generation capacity of the same or hybrid renewable source, subject to CTU approval, no higher net injection and operational/commercial responsibility (pp27–31). The Commission directs POSOCO to monitor such cases and file quarterly exception reports (p30). It also adds the lead-generator agreement requirement to the Regulation 8(1) proviso (pp31–32) and begins a further proviso on renewable power park developer authorisation (p32).

Several issues are deferred: comments on "Exportable Capacity" and on location changes for wind farms are to be handled in the Draft GNA Regulations (p5, pp26–27), and the Detailed Procedure for RE connectivity will be amended later, with the Regulations prevailing on mismatch (p19).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Energy storage deployment

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document