Skip to content

CERC · Central Electricity Regulatory Commission

Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 — Consolidated

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009

Draft regulationDated 7 Jul 2009Published in the Gazette 10 Aug 2009No. L-1/(3)/2009-CERC dated 7th July, 2009

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's 2009 principal regulation, as amended through 2015, for connectivity to and access on the inter-State transmission system. It creates the application-and-approval chain from physical connectivity to long-term access (LTA) and medium-term open access (MTOA), and allocates responsibilities among CTU, RLDCs, SLDCs and transmission licensees (p1–2, p7–9). It came into force on 1 October 2010 after the CTU detailed procedure was approved, as notified in the Gazette on 1 January 2010 (p2).

Chapter 1 defines the applicant categories — conventional and renewable generators, hydro, lead generators, storage, power park developers and bulk consumers — and the access terms (p2–7). Chapter 2 makes CTU the nodal agency, prescribes filing, a non-refundable fee schedule and processing time limits (p7–9). Chapter 3 governs connectivity: application content, two-stage connectivity for specified renewable/storage applicants, connection agreements, dedicated transmission lines, and limited commissioning-period interchange of start-up/infirm power (p9–16). It also restricts transfer of connectivity/LTA except for named cases (p16).

Chapter 4 sets criteria and priority for LTA/MTOA and interface-meter duties (p17–19). Chapter 5 details LTA applications, bank guarantees, system studies, the LTA agreement, PPA-termination intimation, underutilisation, renewal and relinquishment compensation (p19–28). Chapter 6 covers MTOA applications, start-date windows, grant, agreements, dedicated lines and exit (p28–30). Chapter 7 sets curtailment order, transmission-charge recovery and payment, the CTU detailed procedure, RLDC/SLDC fees, UI accounting, losses and dispute resolution (p31–36). Chapter 8 requires a public information page (p36–37). Chapter 9 gives relax/remove-difficulty powers and a partial repeal with savings for existing LTA (p37–38). A closing note lists the five amendments (p38–39).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Transmission tariff

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document