Explanatory Memorandum to the Connectivity Regulations, 2009 Amendment, 2014

Explanatory Memorandum

Explanatory memorandum to a draftDated 20 Feb 2014

Explanatory memorandum to the Inter-State Transmission Connectivity, Long-term Access and Medium-term Open Access (Fourth Amendment) Regulations, 2014 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's explanatory memorandum of 20 February 2014, issued by its Engineering Division, giving the reasoning behind a proposed amendment to the Connectivity Regulations so that generating stations connected to the inter-State transmission system may draw start-up power from the grid under the unscheduled interchange (UI) mechanism (p1, p6–7).

Paragraph 1 (p1–3) recounts that the detailed procedure for grant of connectivity, approved by the Commission on 21.12.2009 under Regulation 8(7) of the CERC (Grant of Connectivity and related matters) Regulations, 2009 (as amended on 21.3.2012), had allowed a generating station to draw start-up power as UI. The Commission's order of 2.11.2012 in Petition No. 117/MP/2012 held that the procedure could not travel beyond the regulations, directed deletion of the words "including drawl of power for commissioning activities" from clause 6.2, protected drawals made before that order from reopening, and asked staff to examine whether UI drawal should be allowed during commissioning and testing.

Paragraphs 2–5 (p3–6) describe the fallout: RLDCs told ISGS to take some form of open access; EMCO Energy and KSK Mahanadi petitioned; the interim order of 7.12.2012 permitted UI drawal pending decision; NTPC's difficulty and APTEL's judgment of 24.05.2011 (a generator taking start-up power is not a consumer) were considered; and the Commission finally directed that UI drawal of start-up power be permitted for stations approved by the CTU for direct ISTS connectivity, subject to RLDC satisfaction that the power is for start-up and not construction, with RLDCs free to stagger or disallow it on grid-security grounds. Staff were directed to process the amendment.

Paragraph 6 (p6–7) states the proposal: amend the Connectivity Regulations accordingly, align the detailed procedure, and prescribe a procedure for start-up power during commissioning based on a POSOCO proposal.

Standard name
Connectivity and GNA Regulations
Primary topics
Deviation settlement (DSM)

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document