Connectivity Regulations, 2009 — Fourth Amendment, 2014 — Statement of Reasons

Statement of Reasons

Statement of reasonsDated 6 May 2015

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons, dated 6 May 2015, for the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fourth Amendment) Regulations, 2014 (p1). It is the reasoning document, not the amendment itself: it reproduces the draft texts that were put out for comment, then records the Commission's decision on each objection received, and states what was finally accepted or rejected.

Pages 1–5 give the background and the draft texts. The Connectivity Regulations, 2009 came into force on 1.1.2010; the Commission proposed to substitute Clause (7) of Regulation 8 so that a generating unit — including a captive generating plant — with inter-State transmission connectivity may interchange infirm power with the grid during the commissioning period, after prior RLDC permission, within a window before and after first synchronisation, with provisos on extension, grid security, onus of proof, and settlement as deviation under the Deviation Settlement Mechanism Regulations, 2014 (p1–2). The same pages reproduce the draft 'Procedure for drawal of Start-up Power for new Generating Stations, 2014' in full: scope, definitions, the general options for availing start-up power, pre-conditions for drawing it under DSM, the application procedure, undertakings, information-updating duties, and the RLDC-side procedure (p2–5). Comments were invited until 14.3.2014, and POSOCO, CSPDCL, NTPC and PGCIL responded (p5).

Pages 6–11 dispose of the comments on Regulation 8(7): CSPDCL's commercial and legal objections (rejected, on the basis of the APTEL ruling that a generator taking start-up power is not a consumer); POSOCO's proposed rewording of the six-month injection limit and its demand for a DISCOM no-objection certificate (both rejected); POSOCO's concern about simultaneous infirm power injection (RLDCs already have authority); NTPC's request for a longer pre-synchronisation drawal window (accepted, and the window was widened to 15 months before first synchronisation, p9, p16); PGCIL's transmission-planning timelines (channeled into the connectivity application process); PGCIL's bank-guarantee and transmission-charge proposals (held out of scope, but LC and stoppage-of-drawal safeguards were added, p10); and the treatment of auxiliary services such as desalination/DM plants and CW pump houses (p10–11).

Pages 11–17 walk through the Procedure paragraph by paragraph — scope, the definition of construction power, the general start-up provision, the application and undertaking requirements, the information to be updated, and the RLDC's obligations — accepting some POSOCO and NTPC suggestions and rejecting others as outside the amendment's scope (p13, p14–15, p17). Page 17 records that POSOCO's edits to the application form and undertaking were incorporated, and that NTPC's suggestion on renewable-energy connectivity eligibility was not considered; the members and Chairperson sign at p18.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Deviation settlement (DSM), Open access

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document