Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission (Sixth Amendment) Regulations, 2017 — Statement of Reasons

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Sixth Amendment) Regulations, 2017

Statement of reasonsDated 28 Mar 2018No.–L-1/(3)/2009-CERC dated 28th March 2018

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The commission's reasons for the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 36 of 45. Check the regulator's original before you rely on it.

This is CERC's Statement of Reasons, dated 28 March 2018, accompanying the Sixth Amendment to the 2009 Connectivity Regulations on grant of connectivity, long-term access (LTA) and medium-term open access (MTOA) in inter-State transmission (p1). It is the Commission's reasoning record, not the regulation itself: it recaps the draft amendment notified on 28.6.2016, the consultation, and the Commission's decisions, quoting the final text of each substituted or inserted provision as it goes.

The opening paragraphs (pp1–2) record that comments came from 49 stakeholders — state utilities, CEA, CTU, POSOCO, DISCOMs, generators, traders and associations — and that a public hearing was held on 17.11.2016, with lists of participants at Appendix-I and Appendix-II.

The rest works through the amendment clause by clause. Paragraph 5 (pp2–4) explains redefining LTA as use of ISTS for more than 7 years, dropping the upper ceiling and aligning with the 7-year threshold in the tariff-bidding guidelines. Paragraph 6 (pp4–8) keeps the minimum MTOA period at 3 months while extending the maximum to 5 years, aligning with the medium-term procurement guidelines. Paragraph 7 (pp8–21) is the largest: it requires generators to build, own and operate dedicated transmission lines, sets a planning limit on their length for large stations, and governs how charges for CTU-built dedicated lines sit in the POC pool before and after LTA operationalisation. Paragraph 8 (pp21–23) permits MTOA on lines expected to be commissioned within six months. Paragraph 9 (pp23–30) inserts Regulation 15B giving LTA customers scheduling priority once they firm up a PPA of a year or more in the target region, and makes MTOA relinquishment charge-free in defined cases. Paragraph 10 (pp30–36) inserts Regulation 16B on underutilisation of LTA/MTOA, releasing idle capacity to MTOA/STOA and directing NLDC to draft a procedure. Paragraph 11 (p36) begins the reasoning on the MTOA application start date.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Open access charges

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.