Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity, Long-term Access and Medium-term Open Access in Inter-State Transmission Regulations, 2009 — Amendment, 2010

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in Inter-State Transmission and related matters) (Amendment) Regulations, 2010

Amendment · Gazette copyDated 3 Sep 2010Published in the Gazette 7 Sep 2010L-1/(3)/2009-CERC dated 3rd September, 2010

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Inter-State Connectivity, Long-term Access and Medium-term Open Access Regulations, 2009 — Amendment, 2010.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The gazette cover (p1) carries a Central Electricity Regulatory Commission notification amending the Commission's 2009 regulations on connectivity, long-term access and medium-term open access in inter-state transmission, made under section 178 of the Electricity Act, 2003 (p2). It was signed on 3 September 2010 and published in the Gazette of 7 September 2010 (p1–2).

Regulation 1 gives the short title and says the amendment takes effect from the date of Gazette publication (p2). Regulation 2 rewrites the definition of "Applicant" in Regulation 2(1)(b)(i) of the principal regulations — who may apply for connectivity: large generating stations including captive plants above a capacity threshold; hydro or renewable stations in a middle capacity band; a "lead generator" acting for a group of small hydro or renewable stations that individually fall below the threshold but together cross it; and bulk consumers (p2).

Regulation 3 amends Regulation 8. It replaces clause (1) so the application must state the applicant's proposed location, the quantum of power to be interchanged with the inter-state transmission system, and other particulars the Central Transmission Utility lays down in the detailed procedure (p3). A proviso sets the point at which a material change in location or quantum forces a fresh application, measured differently for each category of applicant. Two further provisos require grouped small generators to sign a written agreement placing all operational and commercial responsibility on the lead generator under the Indian Electricity Grid Code and other Commission regulations, filed with the connectivity application and copied to the RLDC; CTU must embed that requirement in its detailed procedure and in the connection agreement (p3).

The final change revises the proviso to Regulation 8(8): above stated capacity thresholds, thermal, hydro and renewable stations other than captive plants need not construct a dedicated transmission line to their connection point and are instead taken into CTU and Central Electricity Authority coordinated transmission planning (p3). A closing note records the principal regulations' own gazette publication (p3).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Network planning and investment

Read with this

Other copies of these documents (6)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document