Skip to content

CERC · Central Electricity Regulatory Commission

Grant of Connectivity, Long-term Access and Medium-term Open Access (Sixth Amendment) Regulations, 2016 — Draft

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Sixth Amendment) Regulations, 2016

Draft amendmentDated 28 Oct 2016No.–L-1/(3)/2009-CERC dated 28th October 2016

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The draft CERC notification dated 28 October 2016 would make the Sixth Amendment Regulations, 2016 to the 2009 CERC regulations on grant of connectivity, long-term access (LTA) and medium-term open access (MTOA) in inter-State transmission (p1). It is a draft; the amendment would commence on the date of publication in the Gazette of India (p1).

The draft substitutes the definitions of long-term access and medium-term open access, changing the permissible periods for each (p1). It amends Regulation 8 to make the applicant generating company responsible for developing, owning and operating the dedicated transmission line from the generating station to the pooling station, with CTU to specify line specifications and plan the system so that the maximum length of the dedicated line is limited for thermal stations of 500 MW and above and hydro or renewable stations of 250 MW and above (p2). It sets how transmission charges for dedicated lines already built or under construction by CTU are to be paid until LTA operationalisation and then included in the POC pool (p2). It deletes certain words from Regulation 9(2) (p2).

The draft inserts Regulation 15B, requiring LTA customers to notify the Nodal Agency of a power purchase agreement for supply to the target region and setting scheduling, CTU/RLDC timelines, curtailment priority and MTOA relinquishment without charges (p2–3). It inserts Regulation 16B on underutilisation of LTA/MTOA, allowing RLDC to seek reasons and release unutilised capacity to MTOA/STOA subject to curtailment if the original customer returns (p3–4). It amends Regulation 19(2) to set the MTOA start-date window (p4). It inserts Regulations 33A and 33B giving the Commission power to relax provisions and remove difficulties (p4). A closing Note lists the principal regulations and prior amendments with Gazette dates (p4–5).

Standard name
Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Transmission tariff

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document