CERC · Central Electricity Regulatory Commission

Approval of Detailed Procedure for Grant of Connectivity to RE Projects to ISTS, 2018 — Order

Approval of the Detailed Procedure made under Regulation 27 of the Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) Regulations, 2009 for grant of Connectivity to projects based on renewable energy sources to inter-State Transmission System (ISTS).

OrderDated 15 May 2018No. L-1/(3)/2009-CERC dated 15 th of May, 2018

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Made under the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a short CERC order (p1–2) approving the Detailed Procedure that the Central Transmission Utility is to follow when granting connectivity to projects based on renewable energy sources seeking access to the inter-State transmission system. It is a covering order.

The order records the chain that produced the Procedure — the Commission's direction of 29.9.2017 in Petition No. 145/MP/2017 that CTU frame objective criteria for such connectivity through an amendment to the Detailed Procedure (p1); CTU's draft submitted on 31.1.2018 together with stakeholder comments (p1); a modified draft published on the CERC website on 11.4.2018 inviting comments by 23.4.2018; and 27 stakeholder responses, considered before finalisation (p2).

The operative part is brief: the Commission approves the Detailed Procedure (p2, para 5), directs CTU to give it wide publicity for the information of, and compliance by, all concerned (p2, para 6), and states that it comes into force from the date of the order, i.e. 15 May 2018 (p2, para 7).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗