Public Notice on Draft Procedure for Grant of Connectivity to Renewable Energy Projects, 2018

Public Notice

Public notice on a draftDated 11 Apr 2018

Draft

Voltaic holds no final regulation made from this draft.

Public notice on the draft Procedure for Grant of Connectivity to Renewable Projects to ISTS.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page public notice from the Central Electricity Regulatory Commission (CERC), New Delhi, dated 11.4.2018 and signed by its Secretary (p1). It records that, following the Commission's directions in its order of 29.9.2017 in Petition No. 145/MP/2017, CTU submitted a draft "Procedure for grant of Connectivity to Project based on renewable energy sources to inter-State Transmission System" after taking stakeholder comments into account (p1). The Commission then considered and revised that draft and has decided to seek stakeholder views on the revised version (p1). The revised draft Procedure is enclosed and is stated to be downloadable from the CERC website (p1). Comments and suggestions are invited from stakeholders by 23.4.2018 (p1). The notice itself sets no substantive connectivity rules; it is purely a consultation step, and the operative content sits in the enclosed draft Procedure.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document