Connectivity, LTA and MTOA (Fifth Amendment) Regulations, 2015

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fifth Amendment) Regulations, 2015

Amendment · Gazette copyDated 15 May 2015Published in the Gazette 19 May 2015No.L-1(3)/2009-CERC dated the 15th May, 2015

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission (Fifth Amendment) Regulations, 2015.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Fifth Amendment to CERC's 2009 connectivity and open-access regulations does one thing: it opens the inter-State transmission access framework to Solar Power Park Developers.

Regulation 2 (p2) inserts a new category of applicant into the Principal Regulations — a company authorised by the Central Government as a Solar Power Park Developer — and separately names such a Developer as an entity that may seek long-term access. Regulation 3 (p2–3) adds a proviso to Regulation 8(1) conditioning how CTU handles those applications: a Solar Power Park Developer's application is to be considered only if the Developer is authorised by the Central Government to undertake infrastructural activities, including arranging connectivity, on behalf of solar power generators.

The operative text is about a page and a half. A Note (p3) lists the Gazette serial numbers and dates of the principal regulations and the first to fourth amendments. It takes effect from Gazette publication (p2).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Open access

Read with this

Other copies of these documents (6)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document