Skip to content

CERC · Central Electricity Regulatory Commission

Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 — Fourth Amendment, 2015 — Draft

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Fourth Amendment) Regulations, 2015

Draft amendmentDated 16 Apr 2015No.L-1/(3)/2009-CERC dated 16 th of April 2015

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the draft text of a fourth amendment to the CERC regulations of 2009 governing grant of connectivity, long-term access and medium-term open access in inter-State transmission (p1). It is dated 16 April 2015 and would come into force on the date of publication in the Official Gazette, which is not printed (p1).

The operative changes are narrow. Regulation 2, which sets out who may apply, would gain a new category of eligible entity: any company designated by the Central Government as a Solar Power Park Developer, both generally among applicants and specifically in respect of long-term access (p1).

Regulation 8 would gain a new proviso governing how the CTU handles such an application. CTU may consider it only where the Central Government has authorised the Solar Power Park Developer to undertake infrastructural activities, including arranging connectivity on behalf of solar power generators, and to carry the operational and commercial responsibilities for the renewable generating stations — grid security, scheduling and dispatch, collection and adjustment of transmission charges and losses, UI charges, congestion and other charges — in line with the Indian Electricity Grid Code and the Commission's other regulations. The authorisation documents must be filed with CTU alongside the connectivity application, with a copy to the relevant RLDC (p1–2).

A closing note records the Gazette references for the principal regulations and the first three amendments (p2).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document