Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission (Seventh Amendment) Regulations, 2019

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Seventh Amendment) Regulations, 2019

Amendment · Gazette copyDated 9 Jan 2019No. L-1/(3)/2009-CERC dated 9th January, 2019

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission (Seventh Amendment) Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Seventh Amendment (2019) to CERC's 2009 Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations. The English notification begins at p8 and says the amendment regulations come into force on Gazette publication, though no Gazette date is printed (p8).

Section 1 gives the short title and commencement (p8). Section 2 rewrites Regulation 2 eligibility categories for connectivity, long-term access and medium-term open access: non-renewable generating stations and captive plants of 250 MW and above, renewable energy stations of 50 MW and above, hydro stations between 50 MW and 250 MW, lead-generator arrangements for small hydro/storage or renewable plants aggregating 50 MW and above, renewable plants of 5 MW and above within existing stations or power parks, renewable power park developers, renewable energy implementing agencies and standalone storage projects of 50 MW and above (pp8–10). It also inserts definitions for Renewable Energy Implementing Agency, Renewable Energy Generating Station, hybrid generation and power parks, Renewable Power Park Developers and Storage (pp10–11).

Section 3 amends Regulation 5: transmission licensees need not apply, and new Clause 5A sets out online application, time-stamping, deficiency notice and cure, fee forfeiture/refund and bank guarantee return (p11). Section 4 amends Regulation 8: fresh-application triggers for material change, use of existing connectivity for additional generation capacity, storage project treatment, Stage-I/Stage-II connectivity for specified renewable/storage categories, deeming of the 15.5.2018 Detailed Procedure, transfer/assignment by Renewable Energy Implementing Agencies, dedicated transmission line ownership and bay cancellation, and new Regulation 8A on transfer of connectivity and LTA (pp11–14).

Later sections change wording in Regulations 9 and 12, including that Stage-II Connectivity is not a prerequisite for LTA, delete provisions in Regulations 13, 27 and 29, and substitute LTA and MTOA agreement contents in Regulations 15 and 21 (pp14–16). The Note lists the principal regulations' 2009 Gazette publication and prior amendments (p16).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Energy storage deployment

Read with this

Other copies of these documents (6)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document