Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity, LTA and MTOA (Third Amendment) Regulations, 2013 — Draft

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Third Amendment) Regulations, 2013

Draft amendmentDated 22 Feb 2013No.F.L-1(3)/2009-CERC.- dated 22nd of February 2013

Draft

A proposal that has since been finalised as the Connectivity, LTA and MTOA (Third Amendment) Regulations, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a two-page draft notification in which CERC proposes the Third Amendment to its 2009 regulations on grant of connectivity, long-term access and medium-term open access in inter-State transmission (p1). It is made under section 178 of the Electricity Act, 2003, after previous publication, and is dated 22 February 2013 (p1).

Clause 1 gives the short title and states that the amendment takes effect from the date of publication in the Official Gazette; no Gazette date is printed (p1).

Clause 2 inserts a new sub-clause (e) into clause 1 of Regulation 2 of the Principal Regulations. The addition covers a renewable energy generating station of 1 MW capacity and above developed by a generating company within its existing generating station, where connectivity is sought at the existing connection point with the inter-State transmission system, subject to availability of transmission capacity margin (p1–2).

A closing note records where the Principal Regulations and the first two amendments were published, and the notification is signed by the Secretary (p2).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document