Connectivity, LTA and MTOA Seventh Amendment Regulations, 2018 — Explanatory Memorandum — Draft

Explanatory Memorandum to draft Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Seventh Amendment) Regulations, 2018

Explanatory memorandum to a draftReleased with the draft dated 7 Jul 2009

Explanatory memorandum to the draft Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 — Consolidated.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

An explanatory memorandum that accompanies the draft CERC (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Seventh Amendment) Regulations, 2018. It gives the Commission's reasons for each proposed change to the principal Connectivity Regulations, reproducing the draft amendment clauses alongside the stakeholder correspondence and policy material that prompted them.

Section 1 (pp1–9) deals with who may apply for connectivity. It reproduces the MNRE National Wind-Solar Hybrid Policy of 14 May 2018 on wind-solar hybrid plants, battery storage and the test for recognising a plant as hybrid, and uses it to justify widening the applicant list in Regulation 2(1)(b)(i): renewable generating stations, lead generators pooling smaller renewable or hydro/storage stations, renewable capacity added within an existing station, renewable power park developers, standalone storage projects and Central/State Government-nominated implementing agencies. It explains the new definitions added for storage and for the various renewable and hybrid project categories.

Section 2 (pp9–12) carries the same changes into Regulation 8 — how applications are processed, when a change in location or quantum forces a fresh application, how much additional generation may be accommodated through already-granted connectivity, and the introduction of Stage-I and Stage-II connectivity for renewable and storage applicants, with Stage-I indicating a primary and an alternate location.

Section 3 (pp12–13) states the general bar on transferring, assigning or pledging connectivity or LTA, with carve-outs for 100% subsidiaries and for the designated implementing agency. Sections 4 to 8 (pp13–15) cover consequential changes: terminology in Regulation 9; relaxation of the 10% EPC condition and of the Stage-II prerequisite for long-term access under Regulation 12; deletion of provisions in Regulations 13 and 29 that have been overtaken by the 2018 transmission planning regulations and by the transmission-sharing and RLDC fee regulations; and clarity amendments to Regulations 15 and 21.

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Energy storage deployment

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document