CERC · Central Electricity Regulatory Commission

Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009 — Sixth Amendment, 2017

Central Electricity Regulatory Commission (Grant of Connectivity, Longterm Access and Medium-term Open Access in inter-State Transmission and related matters) (Sixth Amendment) Regulations, 2017

AmendmentDated 17 Feb 2017No.–L-1/(3)/2009-CERC dated 17th February, 2017

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission Regulations, 2009.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Sixth Amendment to its 2009 connectivity, long-term access and medium-term open access regulations for inter-State transmission, issued in New Delhi on 17 February 2017 under notification number L-1/(3)/2009-CERC (p3). It is a short amending instrument carried bilingually, Hindi on pp1-3 and English on pp3-5.

The amendments do four broad things. They redefine the two access products that give the parent regulation its name — "long-term Access" and "Medium-Term Open Access" — by changing the duration bands for use of the inter-State transmission system (p4). They rewrite the dedicated-transmission-line provision so that the applicant generating company develops, owns and operates the line to the transmission licensee's pooling station, with CTU planning obligations and an outer length limit for large thermal and hydro/renewable stations, plus transmission-charge treatment for lines already built by CTU under coordinated planning (p4). They insert two substantive regulations: 15B on firming up of drawl or injection by LTA customers who sign PPAs, including curtailment of MTOA/STOA and relief from relinquishment charges, and 16B on underutilisation of LTA/MTOA, which lets RLDCs call for reasons and release unutilised capacity (pp4-5). They also adjust the commissioning-status wording in Regulation 9(2), tighten the permissible window for the start date of MTOA in Regulation 19(2), and add saving clauses 33A (power to relax) and 33B (power to remove difficulty) (pp4-5).

The instrument binds CTU, RLDCs and generating companies and access customers, and takes effect from the date of publication in the Gazette of India (p4).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Open access, Transmission tariff

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.