CERC · Central Electricity Regulatory Commission

Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission (Third Amendment) Regulations, 2013

Central Electricity Regulatory Commission (Grant of Connectivity, Long-term Access and Medium-term Open Access in inter-State Transmission and related matters) (Third Amendment) Regulations, 2013

Amendment · Gazette copyDated 26 Mar 2013Published in the Gazette 26 Mar 2013No. L-1(3)/2009-CERC. dated 26th March, 2013

Replaced by Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022

See that regulation for the date it took effect and for anything it keeps in force.

The Gazette copy of the Connectivity, LTA and MTOA (Third Amendment) Regulations, 2013.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A two-clause CERC amendment to the 2009 connectivity, long-term access and medium-term open access regulations, published in the Gazette of India (Extraordinary) on 26 March 2013 and effective from that publication date (p1, p3). It creates a new route to inter-State connectivity for renewable energy capacity built inside an existing generating station.

The first amendment inserts a new applicant category into Regulation 2 of the Principal Regulations: a renewable energy generating station of 5 MW and above but under 50 MW that a generating company develops within its existing generating station and that seeks connectivity to the existing ISTS connection point through that station's own electrical system (p3). This capacity band is the eligibility threshold for everything the amendment does.

The second amendment adds a further proviso to Regulation 8(1). CTU may consider such an application only if the host station agrees to act as "Principal Generator" for the renewable station(s), with a written agreement among them allocating operational and commercial responsibility — grid security, scheduling and dispatch, collection and payment or adjustment of transmission charges, UI charges and congestion charges, and compliance with the Indian Electricity Grid Code and other Commission regulations. A copy of the agreement must accompany the application to CTU, with a copy to the relevant RLDC (p4).

A closing note records the gazette references for the Principal Regulations and the earlier two amendments (p4).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA

Read with this

Other copies of these documents (6)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document