CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access Regulations, 2022 — Fourth Removal of Difficulties Order

Removal of Difficulties (Fourth Order) in giving effect to certain provisions of Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022.

OrderDated 7 Oct 2023Petition No. 16/SM/2023 dated 7.10.2023

Made under the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's fourth removal-of-difficulties order on the GNA Regulations, 2022, disposing of Petition No. 16/SM/2023 on 7 October 2023 before a four-member bench chaired by Jishnu Barua (p1). It answers difficulties raised by Grid-India (NLDC) and other stakeholders as the last tranche of GNA provisions took effect on 1 October 2023, following the first tranche on 5 April 2023 (p1). It expressly issues clarifications and practice directions, not amendments.

Part A (pp2–5) addresses KBUNL, a regional generating station connected to both the Bihar STU system and the ISTS with only part of its capacity deemed GNA. The Commission holds that for scheduling at the generation busbar the GNA taken is installed capacity minus ISTS connectivity, so the RLDC schedules the full station; power beyond the ISTS connectivity quantum moving out of the State is treated as flowing over the host State's STU system, needing a host-State no-objection certificate and wheeling charges under SERC regulations; alternatively the generator may surrender State connectivity and raise ISTS connectivity up to installed capacity. The methodology is extended to all similarly placed cases (p5).

Part B (pp5–9) applies the same reasoning to Dhariwal Infrastructure Unit #1 in Maharashtra, holds that no fresh NOC is needed given MSLDC and MSETCL's earlier no-objection in Petition 630/MP/2020, and directs CTUIL to close DIL's additional-GNA application under Regulation 17.1(vi) and return its bank guarantee.

Issue No. 2 (pp9–12) creates a one-time transition route for entities drawing ISTS power exclusively from identified renewable sources (DMRC, from Rewa) to convert deemed GNA into GNARE, subject to proof to CTUIL, a host-SLDC NOC, and the condition that a GNARE holder cannot also hold T-GNA or GNA. DMRC's existing daytime NOC suffices until a fresh one is obtained (pp11–12).

The closing section (p12) reproduces Regulations 42 and 44 of the GNA Regulations, the source of the Commission's power to remove difficulties and issue suo motu orders and practice directions, and disposes of the petition.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Scheduling and despatch, Open access

Read with this

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document