CERC · Central Electricity Regulatory Commission

GNA Regulations commencement notification — effective date 5.4.2023

Notification - effective date 5.4.2023

Commencement noticeDated 1 Apr 2023No.L-1/261/2021/CERC dated 1.4.2023

Commencement notice for the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments. The dates are in the notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC commencement notification that fixes when the Connectivity and General Network Access framework starts to bite. The recitals (p1) record that the GNA Regulations, 2022 were gazetted on 19.7.2022, that Regulation 1.2 leaves commencement to be notified by the Commission with different dates possible for different regulations, that a notification of 14.10.2022 brought certain provisions into force from 15.10.2022, and that the First Amendment Regulations, 2023 were issued on 01.04.2023.

The operative part (pp1–2) issues in partial modification of the 14.10.2022 notification and does several things at once. It brings the First Amendment Regulations into force on 5.4.2023, but carves out the amended Regulations 23.1, 24.2, 24.3, 34.2, 34.3 and 34.4 and the new Regulations 26.4, 26.5 and 26.6, whose commencement is left unfixed. It separately commences Regulations 40.2 to 40.4 and sub-clauses (a) and (b) of Regulation 43.1, and the provisions on fresh Connectivity and GNA applications and their processing and grant, from the same date. For Regulations 37.1 to 37.8 it moves the effective date from 15.10.2022 to 5.4.2023 and requires entities to exercise their options afresh on the basis of their status on that date.

The last three clauses are transitional: until further notification, scheduling and despatch remain based on LTA/MTOA/STOA quantum under the Indian Electricity Grid Code Regulations, 2010; STOA continues to be granted under the Open Access in inter-State Transmission Regulations, 2008; and billing, collection and disbursement of inter-State transmission charges and losses continues under the Sharing Regulations, 2020. Read it as the bridge between the legacy access regime and GNA.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Scheduling and despatch

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document