Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023 — Draft

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023

Draft amendmentDated 27 Jan 2023No. L-1/261/2021/CERC dated 27. 1 .2023

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification (p1) in which CERC proposes the First Amendment to its Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022. It is issued after previous publication and states that it comes into force on a date the Commission will notify (p1). The Note at the end records that the Principal Regulations were gazetted on 14.10.2022 (p16).

Pages 1–3 define and widen the entry routes. A new definition of "Host State" is inserted in Regulation 2.1 (p1). Regulation 5.2 is substituted so that a generating station or ESS may, with CTU approval, add capacity within its granted connectivity, subject to the existing grantee carrying Grid Code responsibility and net injection staying within the total connectivity (p2). Regulation 5.8 is amended to restate the documents a renewable power park developer must file (p2–3) and to add a new class of documentary requirements — LOA/PPA-based or land-plus-equity-based — for REGS other than hydro and ESS other than PSP (p3).

Pages 3–6 deal with security and milestones: amended Conn-BG2/Conn-BG3 furnishing rules and a substitution of "ATS" with "augmentation" in Regulations 7.1, 7.2, 8.2 and 8.3 (p3–4); a new Regulation 9.3 imposing financial-closure deadlines scaled to the start date of connectivity, with proof to CTU and revocation on failure (p4–5); a new proviso letting a bulk consumer's subsidiaries use its GNA (Reg 15.1, p5); and new rules on treating part-commissioned capacity and on returning Conn-BG1/2/3 (Reg 16.2 and new 16.5, p5).

Pages 6–8 create a new eligibility class — an injecting entity connected intra-State seeking GNA to inject into ISTS (Reg 17.1(vi), p6) — alongside deemed GNA for intra-State stations holding Long Term Access under the 2009 Connectivity Regulations (p6), a host-State GNA reduction (new Reg 18.3, p6), the GNARE sub-category for renewable-only drawal (new Reg 20.4, p7), new bank-guarantee requirements for the newly covered categories (Reg 22.2, p7–8) and a lengthened period in Regulation 23.1 (p8).

Pages 8–13 cover exit and charging. New Regulation 24.6 sets the grounds and dates on which connectivity is revoked for REGS, ESS and power park developers, and how the bank guarantees are then dealt with (p8–9). Regulation 25.1 is reworked for relinquishment of GNA — notice, fee, encashment and a new clause on payment timing — with a new Regulation 25.3 for the new injecting class (p9–10). A T-GNARE analogue is added for T-GNA (Reg 26.4, p10–11); an Explanation fixes how SLDC and NLDC split schedules for collective transactions (Reg 34.2, p11); provisos govern return of bank guarantees on GNA effectiveness (Reg 37.3, p11–12); and Medium Term Open Access is brought within deemed GNA, including for trading licensees (Regs 37.5 and 37.8, p12).

Pages 13–16 handle transition and mechanics: the Nodal Agency must issue revised formats and put a revised Detailed Procedure to the Commission within one month of notification (Regs 39.1 and 39.2, p13); one-time GNA charges are waived for capacity already declared commercial (Reg 40.2, p13); the Annexure-I table row for West Bengal is replaced and the "Total" row deleted (p13); and a new Annexure-II lays out the methodology for computing a host State's "Direct drawal" from a regional entity generating station, for existing and future such stations, and how the resulting reduction flows into GNA and sharing calculations (p14–16).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Open access, Transmission tariff

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.