Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2024 — Draft

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024

Draft amendmentDated 31 Jul 2024No. L-1/261/2021/CERC dated 31.07.2024

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a CERC draft notification dated 31.07.2024 (No. L-1/261/2021/CERC) setting out the text of the CERC (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024, which amend the 2022 Principal Regulations. It is made under section 178 of the Electricity Act, 2003 and states that it will come into force on a date the Commission notifies (p1). It is drafted as 40 numbered amending clauses.

Clauses 1–2 give the title and commencement and insert a definition of a "Complex of ISTS substations" / "Cluster of ISTS substations", to be declared by CTU on its website and extended whenever NCT approves a new substation (p1–2).

Clauses 3–10 reshape connectivity applications. Regulation 3.7 is rewritten to specify, stage by stage, how withdrawal of a connectivity or GNA application is handled — forfeiture and refund of application fees, treatment of the various bank guarantees, return of land documents and closing of the application — with partial withdrawal allowed only in the one case named (p2–4). A new Regulation 4.4 creates a route for renewable generating stations owned and operated by BBMB to connect to BBMB's network, splitting the procedure at a 5 MW threshold between the Nodal Agency and BBMB SLDC (p4–5). Provisos allow connectivity to be limited to the LOA/PPA quantum and let large renewable power park developers apply in phases (p5–7). Regulation 5.6 is substituted to permit connectivity at another grantee's terminal bay or switchyard under a sharing agreement, with metering, accounting and scheduling left to an NLDC Detailed Procedure (p5–6). New Regulations 5.9 and 5.10 deal with land requirement per MW published by CTU and with implementing a project on a different land parcel (p7).

Clauses 11–21 cover bank guarantees and post-grant milestones: the Conn-BG1/BG2/BG3 structure, the issuing bank and format, Nodal Agency deadlines for intimating augmentation and start dates (with reasons to the Commission if missed), the contents of the connectivity intimation, signing and revocation of the connectivity agreement, change of renewable energy source within a stated window, monitoring of compliance by the Nodal Agency and of utilisation by RLDCs/NLDC, conversion of connectivity between LOA/PPA-based and other categories (including a re-conversion fee and minimum conversion capacity), parent–subsidiary compliance, and reallocation of terminal bays that fall vacant (p7–15).

Clauses 22–40 amend the remaining provisions: construction and maintenance, transfer of connectivity where a large shareholding changes hands, treatment of encashed guarantee proceeds, GNA application routes and agreement timelines, a GNA-sharing web portal to be built by NLDC, relinquishment charges and notice periods, T-GNA eligibility and operating charges for advance/exigency and collective transactions, allocation of a constrained transmission corridor, and deadlines for revised Detailed Procedures (p15–21). The note on p22 lists the Gazette publication details of the Principal Regulations and the First and Second Amendments, and p23 heads an Annexure-III reporting format.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, SLDC and RLDC fees and charges, Congestion and curtailment

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document