CERC · Central Electricity Regulatory Commission
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2024 — Draft
Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024
Draft amendmentDated 31 Jul 2024No. L-1/261/2021/CERC dated 31.07.2024
Draft
A proposal that has since been finalised as the Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a CERC draft notification dated 31.07.2024 (No. L-1/261/2021/CERC) setting out the text of the CERC (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024, which amend the 2022 Principal Regulations. It is made under section 178 of the Electricity Act, 2003 and states that it will come into force on a date the Commission notifies (p1). It is drafted as 40 numbered amending clauses.
Clauses 1–2 give the title and commencement and insert a definition of a "Complex of ISTS substations" / "Cluster of ISTS substations", to be declared by CTU on its website and extended whenever NCT approves a new substation (p1–2).
Clauses 3–10 reshape connectivity applications. Regulation 3.7 is rewritten to specify, stage by stage, how withdrawal of a connectivity or GNA application is handled — forfeiture and refund of application fees, treatment of the various bank guarantees, return of land documents and closing of the application — with partial withdrawal allowed only in the one case named (p2–4). A new Regulation 4.4 creates a route for renewable generating stations owned and operated by BBMB to connect to BBMB's network, splitting the procedure at a 5 MW threshold between the Nodal Agency and BBMB SLDC (p4–5). Provisos allow connectivity to be limited to the LOA/PPA quantum and let large renewable power park developers apply in phases (p5–7). Regulation 5.6 is substituted to permit connectivity at another grantee's terminal bay or switchyard under a sharing agreement, with metering, accounting and scheduling left to an NLDC Detailed Procedure (p5–6). New Regulations 5.9 and 5.10 deal with land requirement per MW published by CTU and with implementing a project on a different land parcel (p7).
Clauses 11–21 cover bank guarantees and post-grant milestones: the Conn-BG1/BG2/BG3 structure, the issuing bank and format, Nodal Agency deadlines for intimating augmentation and start dates (with reasons to the Commission if missed), the contents of the connectivity intimation, signing and revocation of the connectivity agreement, change of renewable energy source within a stated window, monitoring of compliance by the Nodal Agency and of utilisation by RLDCs/NLDC, conversion of connectivity between LOA/PPA-based and other categories (including a re-conversion fee and minimum conversion capacity), parent–subsidiary compliance, and reallocation of terminal bays that fall vacant (p7–15).
Clauses 22–40 amend the remaining provisions: construction and maintenance, transfer of connectivity where a large shareholding changes hands, treatment of encashed guarantee proceeds, GNA application routes and agreement timelines, a GNA-sharing web portal to be built by NLDC, relinquishment charges and notice periods, T-GNA eligibility and operating charges for advance/exigency and collective transactions, allocation of a constrained transmission corridor, and deadlines for revised Detailed Procedures (p15–21). The note on p22 lists the Gazette publication details of the Principal Regulations and the First and Second Amendments, and p23 heads an Annexure-III reporting format.
Read with this
The regulation
Amendments and corrections
- Dated 18 Jun 2022Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Corrigendum
- Dated 1 Apr 2023Connectivity and General Network Access to the inter-State Transmission System (First Amendment) Regulations, 2023
- Dated 31 Aug 2023Corrigendum to the Order dated 14 October 2022 on the Detailed Procedure for Connectivity and GNA
- Dated 19 Jun 2024Connectivity and GNA Regulations, 2022 — Second Amendment, 2024
- Dated 31 Aug 2025Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
- Dated 4 Nov 2025Connectivity and General Network Access (Third Amendment) Regulations, 2025 — Corrigendum
- Dated 4 Nov 2025Connectivity and GNA Third Amendment Regulations, 2025 — Corrigendum
- Dated 11 Nov 2026Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026
Commencement notices and reasons
- Dated 9 Oct 2022Gazette - effective date 15.10.2022
- Dated 9 Oct 2022Notification — effective date 15.10.2022
- Dated 1 Apr 2023GNA Regulations commencement notification — effective date 5.4.2023
- Dated 1 Apr 2023Gazette — effective date 5.4.2023
- Dated 3 Aug 2023GNA Regulations, 2022 and First Amendment Regulations, 2023 — commencement notification, effective 1.10.2023
- Dated 3 Aug 2023GNA Regulations, 2022 — commencement notification, effective 1.10.2023
- Dated 4 Jul 2024Gazette — effective date 15.07.2024 (Gazette No. 518)
- Dated 4 Jul 2024Connectivity and GNA Second Amendment Regulations, 2024 — commencement notification
- Dated 31 Jul 2024Connectivity and GNA Regulations, 2022 — First Amendment, 2023 — Statement of Reasons
Procedures and orders made under it
- Dated 14 Oct 2022Approval of Detailed Procedure for Connectivity and GNA under the GNA Regulations, 2022
- Dated 22 Sep 2023Connectivity and GNA Regulations, 2022 — Removal of Difficulties (First Order), 2023
- Dated 29 Sep 2023Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties (Second Order), 2023
- Dated 29 Sep 2023Detailed Procedure for Allocation of Transmission Corridor for GNA and T-GNA Scheduling under GNA Regulations, 2022 — 2023
- Dated 1 Oct 2023Connectivity and GNA Regulations, 2022 — Removal of Difficulties (Third Order), 2023
- Dated 7 Oct 2023Connectivity and General Network Access Regulations, 2022 — Fourth Removal of Difficulties Order
- Dated 8 Dec 2025Connectivity and General Network Access Regulations, 2022 — Removal of Difficulties Order, 2025
- Dated 4 May 2026Approval of Detailed Procedure for metering, accounting and scheduling of entities under the GNA Regulations, 2022
- Dated 25 May 2026Approval of Detailed Procedure for Declaration of State-wise Solar and Non-solar Hours under the GNA Regulations
- Dated 9 Jun 2026Procedure in respect of Regulation 11C of the Connectivity and General Network Access Regulations, 2022 — Approval Order
- Dated 10 Jul 2026Treatment of LoA-based Connectivity under GNA Regulations, 2026 — Order
- Dated 14 Aug 2026Procedure for Levying Compensation Charges for Additional Time to Achieve Milestones under the GNA Regulations, 2022
Consolidated copies, for reference (1)
Other copies of these documents (5)
- Dated 7 Jun 2022Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- Dated 1 Apr 2023Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023
- Dated 19 Jun 2024Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Second Amendment, 2024
- Dated 31 Aug 2025Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
- Dated 11 Nov 2026Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026
Earlier drafts
- Dated 27 Jan 2022Workshop notice on Draft Connectivity and General Network Access Regulations, 2021
- Dated 16 Dec 2021File: Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021 — Draft
- Dated 16 Dec 2021Notice extending the date for comments: Public Notice on Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021
- Dated 14 Jan 2022Notice extending the date for comments: Draft Connectivity and GNA Regulations, 2021 — Public Notice (Extension-I) — comments deadline extended
- Dated 26 Jan 2022Explanatory memorandum: Draft Connectivity and GNA Regulations, 2021 — Explanatory Memorandum
- Dated 16 Feb 2022Hearing notice: Public hearing notice on Draft Connectivity and General Network Access Regulations, 2021 — hearing 07.03.2022
- Dated 16 Feb 2022Notice extending the date for comments: Draft Connectivity and General Network Access to the inter-State Transmission System Regulations, 2021 — Comments Deadline Extension-II, 2022
- Dated 27 Jan 2023Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023 — Draft
- Dated 27 Jan 2023Notice extending the date for comments: Connectivity and General Network Access (First Amendment) Regulations, 2023 — Public Notice — Draft
- Dated 13 Feb 2023Explanatory memorandum: Connectivity and General Network Access (First Amendment) Regulations, 2022 — Explanatory Memorandum — Draft
- Dated 16 Feb 2023Notice extending the date for comments: Public Notice — Extension of Comments Deadline on Draft Connectivity and General Network Access (First Amendment) Regulations, 2023
- Dated 27 Feb 2023Hearing notice: Public hearing notice — Draft Connectivity and General Network Access (First Amendment) Regulations, 2023
- Dated 16 Feb 2024Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2024 — Draft
- Dated 16 Feb 2024Public notice: Connectivity and General Network Access (Second Amendment) Regulations, 2024 — Public Notice — Draft
- Dated 5 Mar 2024Explanatory memorandum: Draft Connectivity and General Network Access to the inter-State Transmission System (Second Amendment) Regulations, 2023 — Explanatory Memorandum
- Dated 13 Mar 2024Hearing notice: Public hearing notice — Connectivity and General Network Access (Second Amendment) Regulations, 2024
- Dated 3 Mar 2025Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2025 — Draft
- Dated 3 Mar 2025Public notice: Connectivity and GNA (Fourth Amendment) Regulations, 2025 — Draft — Public Notice
- Dated 12 Mar 2025Explanatory memorandum: Connectivity and GNA Regulations, 2022 — Fourth Amendment, 2025 — Explanatory Memorandum — Draft
- Dated 28 Mar 2025Hearing notice: Public hearing notice on Draft Connectivity and General Network Access (Fourth Amendment) Regulations, 2025
- Dated 15 Apr 2026GNA Milestone Extension Compensation Procedure, 2022 — Draft
- Dated 1 May 2026Notice extending the date for comments: Public hearing notice on GNA milestone-extension compensation charges under the Connectivity and GNA Regulations, 2022
- Dated 6 May 2026Treatment of GNA LoA-Route Connectivity Where PPA Not Signed Within 12 Months — Draft Order, 2026
- Dated 13 May 2026Hearing notice: Public hearing notice — GNA connectivity where PPA not signed within 12 months of LoA, 2026
- Dated 20 May 2026Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Fourth Amendment, 2026 — Draft
- Dated 20 May 2026Public notice: Connectivity and GNA (Fourth Amendment) Regulations, 2026 — Public Notice — Draft
- Dated 2 Jun 2026Hearing notice: Public hearing notice on Draft Connectivity and General Network Access (Fourth Amendment) Regulations, 2026
- Dated 16 Jun 2026Explanatory memorandum: Connectivity and GNA (Fourth Amendment) Regulations, 2026 — Explanatory Memorandum — Draft
- Dated 22 Jun 2026Notice extending the date for comments: Connectivity and GNA (Fourth Amendment) Regulations, 2024 — comment deadline extension notice
- Dated 31 Jul 2024Explanatory memorandum: Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Explanatory Memorandum — Draft
- Dated 31 Jul 2024Public notice: Draft Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Public Notice
- Dated 30 Aug 2024Notice extending the date for comments: Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Extension of comment deadline — Public Notice
- Dated 26 Sep 2024Hearing notice: Connectivity and General Network Access (Third Amendment) Regulations, 2024 — public hearing notice
16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.