Skip to content

CERC · Central Electricity Regulatory Commission

GNA Regulations, 2022 — commencement notification, effective 1.10.2023

Gazette - effective date 1.10.2023

Commencement noticeDated 3 Aug 2023Published in the Gazette 11 Aug 2023F. No. L-1/261/2021/CERC dated 3rd August, 2023

Commencement notice for the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments. The dates are in the notice.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's commencement notification for the inter-State General Network Access regime. It recites the history: the GNA Regulations, 2022 were published on 19.7.2022, but only some provisions were made effective from 15.10.2022; the First Amendment Regulations, 2023 were published on 06.04.2023, with some provisions effective from 05.04.2023 (p2).

Operative paragraph (a) now brings the remaining regulations of the GNA Regulations, including the First Amendment Regulations, into effect from 01.10.2023 (p2). Paragraph (b) provides that from that same date, scheduling and despatch of electricity will be based on the quantum of GNA, GNARE, T-GNA and T-GNARE of each Designated ISTS Customer (DIC) and other grid users, in accordance with the CERC (Indian Electricity Grid Code) Regulations, 2023 (p2).

Page 1 carries only the Gazette masthead and publication particulars; page 2 carries the notification text and the Secretary's signature. Nothing is repealed here — the notice exists to fix a date and to tie the scheduling transition to the Grid Code.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Scheduling and despatch

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document