Skip to content

CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access (Third Amendment) Regulations, 2024 — public hearing notice

Public hearing on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024.

Hearing notice on a draftDated 26 Sep 2024No. L-1/261/2021/CERC dated 26.09.2024

Hearing notice on the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page CERC public notice, dated 26 September 2024, announcing an online video public hearing on the draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024, which the Commission had issued on 31 July 2024 (p1). The notice records that the window for written comments/objections/suggestions closed on 17 September 2024, and that the hearing is the oral stage of that consultation, at 3:00 PM on 4 October 2024 (p1).

It invites representatives of Central and State Governments, Load Despatch Centres, NGOs, IPPs and Financial Institutions, and asks organisations to nominate participants by 2 October 2024 and to say whether they will make a presentation (p1). Presentations are to run 5–10 minutes, within 8–10 slides, with advance copies emailed to three named CERC addresses (p1). The notice sets out only the procedural arrangements for the hearing; it does not itself propose, interpret or amend any regulatory provision.

Standard name
Connectivity and GNA Regulations

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document