Skip to content

CERC · Central Electricity Regulatory Commission

Public hearing notice — Draft Connectivity and General Network Access (First Amendment) Regulations, 2023

Public hearing on Draft Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023

Hearing notice on a draftDated 27 Feb 2023No. L-1/261/2021/CERC dated 27.2.2023

Hearing notice on the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — First Amendment, 2023 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page CERC public notice, dated 27.2.2023, convening an oral public hearing on the draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (First Amendment) Regulations, 2023 — the draft having been issued on 27 January 2023 with comments originally due by 27 February 2023 (p1). The hearing is fixed for 13.03.2023 at 10:30 AM in online video mode (p1).

The notice sets out who is invited — representatives of Central and State Governments, Load Despatch Centres, State Utilities, CPSUs, trading licensees, IPPs, financial institutions, consultancy firms and any other interested party — and asks organisations to nominate a responsible officer conversant with the subject (p1). It sets an administrative timetable: names of proposed participants to be communicated by 07.03.2023, and any presentation limited to 5–10 minutes and 8–10 slides, with an advance copy emailed to the two listed CERC addresses (p1).

The document creates no substantive rights or obligations; it is a procedural step in the consultative process on the draft amendment.

Standard name
Connectivity and GNA Regulations

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document