CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Fourth Amendment) Regulations, 2026

Amendment · Gazette copyDated 11 Nov 2026No. L-1/261/2021/CERC dated the 11th November, 2026

The Gazette copy of the Connectivity and General Network Access to the inter-State Transmission System (Fourth Amendment) Regulations, 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the fourth amendment to CERC's 2022 Connectivity and General Network Access (GNA) Regulations, notified on 11 November 2026 and expressed to take effect from the date of publication in the Official Gazette (p12). It is a drafting-heavy instrument — 33 amending clauses that insert, substitute and delete provisions across the Principal Regulations, closing with a note tracing the Principal Regulations (19.07.2022) and the first three amendments (06.04.2023, 01.07.2024, 09.09.2025) (p28).

Clauses 2–6 (p12–14) restate the connectivity product: new definitions of "Authority" and of the four application routes (LoA/PPA, Land, Land BG); a new Regulation 3.10 giving a standalone right to withdraw the full connectivity quantum — no partial withdrawal — within defined windows after final grant or after two years without final grant, with BGs returned and the application fee forfeited; a new Regulation 4.7 letting REGS/ESS of 50 MW or more, individually or in aggregate through a Lead Generator or Lead ESS, seek non-solar-hour access at substations outside the usual set, with CTUIL publishing and monthly updating available margins; and Regulation 4.8 allowing conversion between full-day, solar-hour and non-solar-hour access.

Clauses 7–12 (p14–18) rework application mechanics under Regulations 5.1, 5.2, 5.6, 5.8, 5.10 and 5.11 — energy-capacity sizing for ESS, exclusion of technical-compliance capacity at the point of injection from installed capacity, application fee amounts, accommodations for additional ESS/technical-compliance capacity, sub-lease documents limited to parent–subsidiary and Government-policy cases, multi-located REGS supported by a single LoA/PPA, bank guarantee levels, and a permitted second change of land parcel.

Clauses 13–16 (p18–22) address procedure and compliance: closure of applications with refund of BGs where interconnection studies or augmentation approvals fail; extended timelines for furnishing BGs after augmentation approval; a shorter lead time for firm start-date intimation; fee-bearing second source changes with worked illustrations; and revised land and financial-closure obligations, route conversion and sub-50 MW remnant treatment under Regulation 11A/11B.

Clauses 17–33 (p22–28) cover transfers, charges and implementation: transfer of connectivity where a station or ESS has achieved COD, new Regulation 23A on transfer of GNA, the one-time GNA charge and its recovery from Conn-BGs, dual connection to ISTS and intra-State/distribution systems, return of Conn-BGs one year after COD instead of in five annual instalments, transition provisions in new Regulation 37.11, mandated detailed procedures within fixed periods, and Annexure-IV clause 2A for processing non-solar-hour applications within existing margins.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Energy storage deployment

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (4)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.