GNA Milestone Extension Compensation Procedure, 2022 — Draft

Procedure for levying compensation charges for permitting additional time to achieve milestones under the Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022

Draft orderDated 15 Apr 2026Petition No. 5/SM/2026 dated 15.04.2026

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

CERC's Petition No. 5/SM/2026 dated 15.04.2026 is a consultation proposal, not an order. It proposes a procedure for levying Milestone Extension Charges (MEC) when a connectivity grantee seeks more time to meet the land-document, financial-closure or commercial-operation-date (CoD) milestones under the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 — the GNA Regulations, as amended (p1–2).

The proposal notes that failure to meet these milestones ordinarily leads to revocation of connectivity and encashment of bank guarantees under Regulations 11A, 11B and 24.6, quoted at length (p2–5). To handle requests uniformly, CERC proposes to use its power to relax (Regulation 41) and power to remove difficulty (Regulation 42) (p5). A Staff Paper of 25.11.2025 had proposed MEC rates and time caps; stakeholder comments are summarised, including demands to reduce or remove charges (p6). CERC's rationale links land-document MEC to the land bank guarantee and FC/CoD MEC to the Conn-BGs over the extension period, with worked illustrations (p6–8). It also proposes a two-month post-GNA-effective-date window without MEC for trial runs and pre-commissioning (p8–9).

Annexure-I contains the proposed Procedure (p10–14). It sets eligibility thresholds tied to land documents, differentiated for the Land BG route and LOA/PPA route, plus financial closure and EPC award evidence for CoD extensions (p10–11). It specifies MEC rates, monthly escalation slabs, maximum additional time for each milestone, advance payment 15 days ahead, refund of unutilised days without interest, and consequences of failure (p11–13). General clauses require separate compensation per milestone, preserve the firm start date of connectivity, retain mismatch-charge liability under the Sharing Regulations, 2020, and direct MEC receipts to the Deviation and Ancillary Services Pool Account (p13–14).

Comments are invited by 30.04.2026, and a public hearing will be notified separately (p9). The Commission states it will issue an Order after considering comments (p9).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document