CERC · Central Electricity Regulatory Commission

Corrigendum to the Order dated 14 October 2022 on the Detailed Procedure for Connectivity and GNA

Corrigendum to the order dated 14th October,2022 in Order No.-L-1 /261/2021- CERC

CorrigendumDated 31 Aug 2023No.-L-1/261/2021/CERC dated 31st August, 2023

Corrects the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A one-page corrigendum in which CERC corrects an error in its own earlier order (p1). The order being corrected, dated 14 October 2022 (Order No.-L-1/261/2021-CERC), approved the 'Detailed Procedure for Connectivity and GNA' under Regulation 39.1 of the CERC (Connectivity and General Network Access to the inter-State Transmission System) Regulations, 2022 (p1). The Commission states that an inadvertent error was noticed and makes a single correction: Clause (iii) of Para 8 of the 2022 order, as it appears at pages 5 and 6 of that order, stands deleted (p1). Paragraph 2 confirms that all other terms of the 14 October 2022 order remain unchanged (p1). It reuses the same coram of three Members and is dated 31 August 2023 (p1). Read it only alongside the 2022 order and the approved procedure it modifies.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document