CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access (Third Amendment) Regulations, 2024 — Explanatory Memorandum — Draft

Explanatory Memorandum of Draft CERC (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2024

Explanatory memorandum to a draftDated 31 Jul 2024No. L-1/261/2021/CERC dated 31.07.2024

Explanatory memorandum to the Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2024 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is CERC's Explanatory Memorandum for the draft Third Amendment to the Connectivity and General Network Access (GNA) Regulations, 2022 (p1). It explains why each change is proposed and reproduces the text of the proposed amendments; it is not itself the notified amendment. The draft Third Amendment was issued on 31.07.2024 (p1), though the heading labels it 2023.

Part A (pp3–8) deals with bank guarantees. It proposes stage-wise treatment of Land BG and Conn-BG1/2/3 when an application for connectivity or GNA is withdrawn, partially withdrawn, closed, or the connectivity is relinquished. It also adds an option to pay cash instead of encashment (p6).

Part B (pp8–37) covers connectivity. It proposes connectivity for REGS to BBMB's network (pp10–11), phased applications by Renewable Power Park Developers (p12), sharing of terminal bays and switchyards between injecting and drawal entities (pp12–15), recognition of certain LoA/PPA documents and limits connectivity on that route to the LoA/PPA quantum (pp15–20), a CTU-published land requirement per MW (p20), tighter timelines for Conn-BGs and final grant (pp20–24), change of renewable configuration (pp24–25), conversion between Land/Land BG and LoA routes with separate compliance for each part (pp25–29), parent-subsidiary compliance flexibility (pp29–31), compliance monitoring (pp31–32), post-COD utilisation monitoring (pp32–33), and reallocation of connectivity within ISTS substation clusters (pp33–37).

Part C (pp37–43) covers GNA: construction of the connecting line by the entity itself, intra-State drawee eligibility, timelines for Conn-BGs for Reg 17.1(iii) entities, the trigger for one-time GNA charges, minimum capacity for intra-State injectors, and an NLDC web portal for surplus GNA.

Part D (pp44–47) covers T-GNA: eligibility for intra-State injecting entities, a cap on T-GNA for bulk consumers, and operating charges for T-GNA transactions.

Part E (pp47–50) incorporates directions from the 22.09.2023 order in Petition No. 11/SM/2023: change of land parcel, early terminal bay for start-up/infirm power, transfer of connectivity, and allocation of the transmission corridor.

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Energy accounting and settlement, Fees payable to the Commission

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (5)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document